4.2. Procedure
Place the test item in the chamber, positioned as near the center of the chamber as practicable. If more than one
item is being tested, there shall be a minimum clearance of 4 inches between surfaces of test items or any other
material or object capable of furnishing protection. Also, no surface of the test item shall be closer than 4 inches from
any wall of the test chamber. Orient the item so as to expose the most critical or vulnerable parts to the dust stream.
The test item orientation may be changed during the test if so required by the component specification.
Step 1 - Set the chamber controls to maintain an internal chamber temperature of 23°C (73°F) and a relative
humidity of less than 22 percent. Adjust the air velocity to 1,750 ±250 feet per minute. Adjust the
dust feeder to control the dust concentration at 0.3 ±0.2 grams per cubic foot. With test item
nonoperating, maintain these conditions for 6 hours.
Step 2 - Stop the dust feed and reduce the air velocity to 300 ±200 feet per minute. Raise the internal
chamber air temperature to 63°C (145°F) and adjust humidity control to maintain a relative humidity of
less than 10 percent. Hold these conditions for 16 hours.
Step 3 - While holding chamber temperature at 63°C (145°F) adjust the air velocity to 1,750 ±250 fpm,
maintain a relative humidity of less than 10 percent. Adjust the dust feeder to control the dust
concentration at 0.3 ±0.2 grams per cubic foot. With the test item nonoperating, maintain these
conditions for 6 hours.
Step 4 - Turn off all chamber controls and allow the test item to return to standard ambient conditions.
Remove accumulated dust from the test item by brushing, wiping, or shaking, care being taken to
avoid introduction of additional dust into the test item. Under no circumstances, shall dust be
removed by either air blast or vacuum cleaning.
NOTE: 1. This test specimen may be operating during either or both of the 6-hour test periods (step 1 or 3)
if so required by the component specification.
2. When the component specifications reference test conditions A, B, or C of the previous version of
this test method, steps 1 through 4 of this test will be used unless otherwise specified.
5. DETAILED REQUIREMENTS
5.1 Summary. The following details are to be specified in the individual specification:
a. Change in orientation during test, if required.
b. Whether component is to operate during test and length of time required for operation and measurements.
c. Whether the second 6-hour test at 63°C (145°F) shall be performed immediately after reaching
stabilization in step 2.
2
北测(上海)电子科技有限公司
联系方式:xuyj@beice-sh.com 13917165676

MIL-STD-202-110
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.)
6.1 Supersession data. The main body and 38 parts of this revision of MIL-STD-202 replace superseded MIL-STD-
202.
Custodians: Preparing activity:
Army - CR DLA – CC
Navy - EC
Air Force - 85 (Project 59GP-2015-014)
DLA - CC
Review activities:
Army - AR, AT, AV, CR4, MI, SM, TE
Navy - AS, OS, SH
Air Force - 19, 99
NSA - NS
NOTE: The activities listed above were interested in this document as of the date of this document. Since
organizations and responsibilities can change, you should verify the currency of the information above using the
ASSIST Online database at https://assist.dla.mil/
3
北测(上海)电子科技有限公司
联系方式:xuyj@beice-sh.com 13917165676

INCH-POUND
MIL-STD-202-111
18 April 2015
SUPERSEDING
MIL-STD-202G
w/CHANGE 2 (IN PART)
28 June 2013
(see 6.1)
DEPARTMENT OF DEFENSE
TEST METHOD STANDARD
METHOD 111, FLAMMABILITY (EXTERNAL FLAME)