QP-242E 工程师培训手册 (6.0).pdf.pdf - 第2页
FK-9F98-07 QP242E Training Text for Service Engineers 6th edition Index [ 1 /8 ] Fuji Machine Mfg. Co., Ltd. Okazaki SMT Equipment Quality Assurance Dept. Technical Support Div. Section No.2 Index- 1 N o te: Thi s manu a…

Nam e
Do not Copy / Confidential
Do not Copy / ConfidentialDo not Copy / Confidential
Do not Copy / Confidential
無断複写
無断複写無断複写
無断複写
複製厳禁
複製厳禁複製厳禁
複製厳禁
社外秘
社外秘社外秘
社外秘
Com pany Nam e
Modularized
ModularizedModularized
Modularized
Multi‐Purpose
Multi‐PurposeMulti‐Purpose
Multi‐Purpose
SMD
SMDSMD
SMD
Mounter
MounterMounter
Mounter
QP-242E
QP-242EQP-242E
QP-242E
Training Text for Service Engineers
( 6
( 6( 6
( 6
th
thth
th
edition )
))
)
● Also refer to the latest technical report when using this manual for servicing.
(このテキストをサービス対応のための参考資料として用いる場合は、前もって最新の技術資料とご照合ください。)
●If there are any requests regarding the manual, please contact the Quality Assurance Div.,
Technical Support Div.2. “infall@okazaki.fuji.co.jp”
(このテキストについて改善などの提案がある場合は、精機品質保証部 第2技術課までご連絡ください。)
Fuji Machine Manufacturing Co., Ltd.
SMT Equipment Quality Assurance Div.
富士機械製造株式会社
(精機品質保証部 発行)
愛知県岡崎市恵田町字北横1番3花園工業団地内
℡0564-45-2000(代)
1999年 6月25日 制定
2001年 5月25日 改定
FK-9F98-07
レベル C 文書
配布分類
承認 審査 作成
配布№文書管理責任者
(管理文書のみ)
□管理文書
※1
■参考(管理外)
※2
※1 Con ten t is contin ually monitored an d subject to change.
※2 Reference: Content is con fir m ed but may be su bject to change.
門松
’0 1 .5.22
品質保証部
柄澤
’0 1 .5.21
第2技術部
門松
’0 1 .5.22
品質保証部

FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [1/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-1
Note: This manual is based on the calibration manual for inspection.
Please use this manual as reference for training.
1. QP242E Initial Adjustments (1) Page
1.1 Leveling the Machine 1-1
1.2 Connecting the ICM and PLM 1-3
1.3 Checking the Conveyor Parallelism and Linkage Chain Tension 1-5
2. Static Accuracy Measurement
2.1 X, Y Axes Straightness Measurement 2-1
2.2 X, Y Axes Squareness Measurement 2-2
2.3 Z-axis Perpendicularity Measurement 2-2
3. QP242E Initial Adjustments (2)
3.1 Temporary Proper Data Transmission
(Required Proper Data Details) 3-1
3.2 Parameter Transmission Procedure 3-3
3.3 Lifter Plate Height Measurement 3-4
3.4 Air Valve Throttle Adjustment 3-4
3.5 Table Mechanical Valve Adjustments 3-5
3.6 Fixed Rail Parallelism and Flatness Measurement 3-6
3.7 Board Clamp Adjustment 3-6
3.8 Table UP Limit and DOWN Limit Sensor Adjustments 3-7
3.9 Board Stopper Sensor and Stopper Position Adjustments 3-7
3.10 Board Sensor Adjustment 3-8
3.11 Conveyor Width Check 3-10
3.12 MFU Clamp Pin and Stopper Position Adjustments 3-10
3.13 MFU IN/OUT Port check 3-10
3.14 Tape Leaf Sensor Adjustment 3-10
I N D E X

FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [2/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-2
3.15 MFU Set Sensor Adjustment 3-11
3.16 Nozzle Changer Operation Check and Sensor Adjustment
(For Single Types Only) 3-12
3.17 Securing the Head’s Vacuum Hose 3-12
4. Axis Zero Setting Adjustment
4.1 Cooling Fan Operation Check 4-1
4.2 Digital Amplifier Parameter Check 4-1
4.3 Temporary Zero Setting 4-1
4.4 Before Beginning the Axis Zero Setting Adjustments 4-1
4.5 X-axis Zero Setting Adjustment and Belt Tension Adjustment 4-2
4.6 Y-axis Zero Setting Adjustment 4-2
4.7 Z-axis Zero Setting Adjustment and Belt Tension Adjustment 4-3
4.8 Q-axis Zero Setting Adjustment 4-3
4.9 Proper Data Zero Offset Q-Measurement 4-4
4.10 Other Module Adjustments 4-4
4.11 Before Beginning the Axis Zero Setting Adjustments 4-5
4.12 X-axis Zero Setting Adjustment and Belt Tension Adjustment 4-5
4.13 Y-axis Zero Setting Adjustment 4-5
4.14 Z-axis Zero Setting Adjustment and Belt Tension Adjustment 4-5
4.15 Q-axis Zero Setting Adjustment 4-5
5. Before Beginning the Proper Data Measurements
5.1 Attaching the Nozzle Changer Holder Bracket and Q-cover 5-1
5.2 Mounting the Index Holder and Adjusting the Holder Bracket 5-1
5.3 Mounting Shafts for Single Nozzles 5-2
5.4 Measuring the Single Shaft Swing 5-2
5.5 Adjusting the Pressure Control System 5-2
5.6 Attaching the Single Nozzle Q-Cover 5-3
5.7 Measuring the Nozzle Vacuum Pressure 5-3
5.8 Lighting Unit Operation Check 5-4