QP-242E 工程师培训手册 (6.0).pdf.pdf - 第6页
FK-9F98-07 QP242E Training Text for Service Engineers 6th edition Index [ 5 /8 ] Fuji Machine Mfg. Co., Ltd. Okazaki SMT Equipment Quality Assurance Dept. Technical Support Div. Section No.2 Index- 5 1 0 . S TU A dj ustm…

FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [4/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-4
8. MTU6 Adjustment
8.1 Prior to Adjusting the MTU6 8-1
8.2 Timer Adjustment 8-1
8.3 Tray Storage Check Sensor Amp and Controller Settings 8-2
8.4 Servo Amp Dip Switch Settings 8-2
8.5 TZ-axis and TY-axis Timing Belt Removal 8-3
8.6 MTU Provisional Connection 8-3
8.7 I/O Check of Each Sensor 8-4
8.8 Proper Data Transmission 8-4
8.9 Zero Set Check 8-5
8.10 Shuttle Parallel Measurement 8-6
8.11 Shuttle Slope Levelness Measurement 8-6
8.12 MTU Descent Speed Adjustment 8-6
8.13 Connecting the MTU 8-7
8.14 Leveling 8-7
8.15 Original_Position_TZ Provisional Measurement 8-7
8.16 Zero_Offset_TZ & Original_Position_TZ Input 8-8
8.17 Slope Adjustment & Zero_Offset_TY Measurement 8-8
8.18 Perform Zero Set Again 8-9
8.19 Max, Min Limit Position 8-9
8.20 Shuttle Jaw Adjustment 8-10
8.21 Device_Origin_MTU6D0_X, Y 8-13
8.22 Pickup_Height_MTU6D_Z 8-14
8.23 MTU_Parts_Eject_Pos. CV_X, Y 8-15
8.24 Proper Data Transmission to F4G 8-15
9. Reject Parts Conveyor Adjustment & Operation Check
9.1 Prior to Adjusting the Reject Parts conveyor 9-1
9.2 Belt Tension Adjustment 9-1
9.3 Part Check Sensor Adjustment 9-1
9.4 Large Part Detection Sensor Adjustment 9-1
9.5 Operation Check of Air Pencil 9-2
9.6 Input of Proper Data Setting for PLM?
MFU Parts Eject Conveyor D no 9-2

FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [5/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-5
10. STU Adjustment & Operation Check
10.1 Prior to Adjusting the STU 10-1
10.2 STU Loading 10-2
10.3 Proper Data Check 10-2
10.4 Tray Positioning Side Plate Parallel Measurement 10-2
10.5 Tray Position Check Sensor & Add Check Sensor Adjustment 10-2
10.6 Tray Existence Check Sensor Adjustment 10-3
10.7 Tray Holder Lower Limit Sensor Adjustment 10-4
10.8 Tray Holder Parallel Measurement 10-5
10.9 Tray Remover Forward and Retract Limit Adjustment 10-5
10.10 Tray Remover Forward and Retract Speed Adjustment 10-5
10.11 Tray Remover Upper Limit Sensor Adjustment 10-6
10.12 Tray Remover Provisional Position Adjustment 10-6
10.13 Tray Eject Sensor Adjustment 10-7
10.14 STU Operation Check 10-7
10.15 Remover Operation Check 10-7
10.16 Check of Restrictions when STU is Installed 10-7
10.17 STU Rear LED Display 10-8
11. Coplanarity Check Adjustment & Operation Check
11.1 Prior to Coplanarity Check (Bent Lead Detection)
Adjustment 11-1
11.2 Proper Data Measurement & Transmission 11-1
11.3 Jig Preparation 11-2
11.4 Positioning Key Parallel Adjustment 11-2
11.5 Sensor Bracket Installation 11-2
11.6 Sensor Installation Surface Level Check 11-2
11.7 LLL Sensor Installation 11-2
11.8 LLL Sensor Height Adjustment 11-2
11.9 LLL Sensor X-direction Positioning 11-3
11.10 Proper Data Measurement 11-3

FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [6/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-6
12. Placing Pressure Control Function Adjustment
12.1 Prior to Adjusting the Placing Pressure Control Function 12-1
12.2 Proper Data Settings and Transmission 12-1
12.3 Placing Pressure Control Device Height Adjustment 12-2
12.4 Placing Pressure Control Device Leveling 12-2
12.5 PPC_Calibration_Position_X,Y 12-2
12.6 Digital Indicator Settings 12-3
12.7 Load Cell Calibration Check 12-4
12.8 Placing Pressure Calibration Measurement 12-4
12.9 Proper Data Transmission to F4G 12-5
13. MTU71E Adjustment
13.1 Prior to Adjusting the MTU71E 13-1
13.2 MTU Descent Speed Adjustment 13-1
13.3 Timer Adjustment 13-2
13.4 Servo Amp Dip Switch Settings 13-2
13.5 TZ-axis and TY-axis Timing Belt Removal 13-2
13.6 Shuttle Assembly Preliminary Installment 13-2
13.7 Remover Station Installation 13-2
13.8 MTU71E Unit Preliminary Connection 13-3
13.9 Air Regulator Adjustment 13-3
13.10 Remover Placement Hook Parallel and
Perpendicularity Alignment 13-4
13.11 Remover Chuck Jaw Opening Adjustment 13-4
13.12 Remover Station Perpendicularity Adjustment 13-4
13.13 Speed Controller Adjustments for the Remover 13-5
13.14 Remover Station Sensor Adjustment 13-5
13.15 Securing the Remover Station Air Hose 13-6
13.16 Remover Operation Check 13-6
13.17 Empty Tray Eject Detection Sensor
& Tray Holder Load Check Sensor Amp Settings 13-6
13.18 Tray Positioning and Tray Addition Sensor Amp Settings 13-6