QP-242E 工程师培训手册 (6.0).pdf.pdf - 第4页

FK-9F98-07 QP242E Training Text for Service Engineers 6th edition Index [ 3 /8 ] Fuji Machine Mfg. Co., Ltd. Okazaki SMT Equipment Quality Assurance Dept. Technical Support Div. Section No.2 Index- 3 6 . Pr o p e r D ata…

100%1 / 132
FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [2/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-2
3.15 MFU Set Sensor Adjustment 3-11
3.16 Nozzle Changer Operation Check and Sensor Adjustment
(For Single Types Only) 3-12
3.17 Securing the Heads Vacuum Hose 3-12
4. Axis Zero Setting Adjustment
4.1 Cooling Fan Operation Check 4-1
4.2 Digital Amplifier Parameter Check 4-1
4.3 Temporary Zero Setting 4-1
4.4 Before Beginning the Axis Zero Setting Adjustments 4-1
4.5 X-axis Zero Setting Adjustment and Belt Tension Adjustment 4-2
4.6 Y-axis Zero Setting Adjustment 4-2
4.7 Z-axis Zero Setting Adjustment and Belt Tension Adjustment 4-3
4.8 Q-axis Zero Setting Adjustment 4-3
4.9 Proper Data Zero Offset Q-Measurement 4-4
4.10 Other Module Adjustments 4-4
4.11 Before Beginning the Axis Zero Setting Adjustments 4-5
4.12 X-axis Zero Setting Adjustment and Belt Tension Adjustment 4-5
4.13 Y-axis Zero Setting Adjustment 4-5
4.14 Z-axis Zero Setting Adjustment and Belt Tension Adjustment 4-5
4.15 Q-axis Zero Setting Adjustment 4-5
5. Before Beginning the Proper Data Measurements
5.1 Attaching the Nozzle Changer Holder Bracket and Q-cover 5-1
5.2 Mounting the Index Holder and Adjusting the Holder Bracket 5-1
5.3 Mounting Shafts for Single Nozzles 5-2
5.4 Measuring the Single Shaft Swing 5-2
5.5 Adjusting the Pressure Control System 5-2
5.6 Attaching the Single Nozzle Q-Cover 5-3
5.7 Measuring the Nozzle Vacuum Pressure 5-3
5.8 Lighting Unit Operation Check 5-4
FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [3/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-3
6. Proper Data Measurement
6.1 Max, Min Limit Position 6-1
6.2 Temporary Adjustment of Lens Half Mirror Gap 6-1
6.3 Focusing the Mark Camera 6-2
6.4 Securing the Half Mirror 6-3
6.5 Checking the X-axis Stroke 6-3
6.6 Mark Camera X, Y, Q 6-3
6.7 Mark Read Pos. X, Y 6-4
6.8 Program_Origin_X0, Y0 6-4
6.9 Placement_Height_Z0 6-5
6.10 Adjusting the Parts Camera Height, the Lens Aperture,
and the Temporary Focus 6-5
6.11 Adjusting the Parts Camera Lighting Position 6-7
6.12 Line Scan Camera Test 6-9
6.13 Camera Center XC, YC Temporary Measurement 6-10
6.14 Focusing the Parts Camera 6-10
6.15 Parts Camera X, Y, Q Measurement 6-11
6.16 Camera Center XC, YC, Nozzle Holder Center X, Y Measurement 6-12
6.17 Nozzle_Select_Pos.Z Measurement 6-12
6.18 Adjusting the Nozzle Check Sensor 6-12
6.19 Nozzle_Select_Pos. X, Y, Z Measurement 6-13
6.20 Nozzle_Check_Pos. X, Y, Z 6-15
6.21 Nozzle_Diameter Check Adjustment 6-16
6.22 Nozzle Change Operation Check 6-16
6.23 Parts_Eject_Pos_X, Y 6-16
6.24 Device_Origin_IPD0_X, Y 6-17
6.25 Pickup_Height_IPD_Z0 6-17
6.26 Mark Camera Repeat Reading Accuracy 6-18
7. Operation and Function Check
7.1 Placement Accuracy Check 7-1
FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [4/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-4
8. MTU6 Adjustment
8.1 Prior to Adjusting the MTU6 8-1
8.2 Timer Adjustment 8-1
8.3 Tray Storage Check Sensor Amp and Controller Settings 8-2
8.4 Servo Amp Dip Switch Settings 8-2
8.5 TZ-axis and TY-axis Timing Belt Removal 8-3
8.6 MTU Provisional Connection 8-3
8.7 I/O Check of Each Sensor 8-4
8.8 Proper Data Transmission 8-4
8.9 Zero Set Check 8-5
8.10 Shuttle Parallel Measurement 8-6
8.11 Shuttle Slope Levelness Measurement 8-6
8.12 MTU Descent Speed Adjustment 8-6
8.13 Connecting the MTU 8-7
8.14 Leveling 8-7
8.15 Original_Position_TZ Provisional Measurement 8-7
8.16 Zero_Offset_TZ & Original_Position_TZ Input 8-8
8.17 Slope Adjustment & Zero_Offset_TY Measurement 8-8
8.18 Perform Zero Set Again 8-9
8.19 Max, Min Limit Position 8-9
8.20 Shuttle Jaw Adjustment 8-10
8.21 Device_Origin_MTU6D0_X, Y 8-13
8.22 Pickup_Height_MTU6D_Z 8-14
8.23 MTU_Parts_Eject_Pos. CV_X, Y 8-15
8.24 Proper Data Transmission to F4G 8-15
9. Reject Parts Conveyor Adjustment & Operation Check
9.1 Prior to Adjusting the Reject Parts conveyor 9-1
9.2 Belt Tension Adjustment 9-1
9.3 Part Check Sensor Adjustment 9-1
9.4 Large Part Detection Sensor Adjustment 9-1
9.5 Operation Check of Air Pencil 9-2
9.6 Input of Proper Data Setting for PLM?
MFU Parts Eject Conveyor D no 9-2