QP-242E 工程师培训手册 (6.0).pdf.pdf - 第7页

FK-9F98-07 QP242E Training Text for Service Engineers 6th edition Index [ 6 /8 ] Fuji Machine Mfg. Co., Ltd. Okazaki SMT Equipment Quality Assurance Dept. Technical Support Div. Section No.2 Index- 6 1 2 . P lac i ng Pr …

100%1 / 132
FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [5/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-5
10. STU Adjustment & Operation Check
10.1 Prior to Adjusting the STU 10-1
10.2 STU Loading 10-2
10.3 Proper Data Check 10-2
10.4 Tray Positioning Side Plate Parallel Measurement 10-2
10.5 Tray Position Check Sensor & Add Check Sensor Adjustment 10-2
10.6 Tray Existence Check Sensor Adjustment 10-3
10.7 Tray Holder Lower Limit Sensor Adjustment 10-4
10.8 Tray Holder Parallel Measurement 10-5
10.9 Tray Remover Forward and Retract Limit Adjustment 10-5
10.10 Tray Remover Forward and Retract Speed Adjustment 10-5
10.11 Tray Remover Upper Limit Sensor Adjustment 10-6
10.12 Tray Remover Provisional Position Adjustment 10-6
10.13 Tray Eject Sensor Adjustment 10-7
10.14 STU Operation Check 10-7
10.15 Remover Operation Check 10-7
10.16 Check of Restrictions when STU is Installed 10-7
10.17 STU Rear LED Display 10-8
11. Coplanarity Check Adjustment & Operation Check
11.1 Prior to Coplanarity Check (Bent Lead Detection)
Adjustment 11-1
11.2 Proper Data Measurement & Transmission 11-1
11.3 Jig Preparation 11-2
11.4 Positioning Key Parallel Adjustment 11-2
11.5 Sensor Bracket Installation 11-2
11.6 Sensor Installation Surface Level Check 11-2
11.7 LLL Sensor Installation 11-2
11.8 LLL Sensor Height Adjustment 11-2
11.9 LLL Sensor X-direction Positioning 11-3
11.10 Proper Data Measurement 11-3
FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [6/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-6
12. Placing Pressure Control Function Adjustment
12.1 Prior to Adjusting the Placing Pressure Control Function 12-1
12.2 Proper Data Settings and Transmission 12-1
12.3 Placing Pressure Control Device Height Adjustment 12-2
12.4 Placing Pressure Control Device Leveling 12-2
12.5 PPC_Calibration_Position_X,Y 12-2
12.6 Digital Indicator Settings 12-3
12.7 Load Cell Calibration Check 12-4
12.8 Placing Pressure Calibration Measurement 12-4
12.9 Proper Data Transmission to F4G 12-5
13. MTU71E Adjustment
13.1 Prior to Adjusting the MTU71E 13-1
13.2 MTU Descent Speed Adjustment 13-1
13.3 Timer Adjustment 13-2
13.4 Servo Amp Dip Switch Settings 13-2
13.5 TZ-axis and TY-axis Timing Belt Removal 13-2
13.6 Shuttle Assembly Preliminary Installment 13-2
13.7 Remover Station Installation 13-2
13.8 MTU71E Unit Preliminary Connection 13-3
13.9 Air Regulator Adjustment 13-3
13.10 Remover Placement Hook Parallel and
Perpendicularity Alignment 13-4
13.11 Remover Chuck Jaw Opening Adjustment 13-4
13.12 Remover Station Perpendicularity Adjustment 13-4
13.13 Speed Controller Adjustments for the Remover 13-5
13.14 Remover Station Sensor Adjustment 13-5
13.15 Securing the Remover Station Air Hose 13-6
13.16 Remover Operation Check 13-6
13.17 Empty Tray Eject Detection Sensor
& Tray Holder Load Check Sensor Amp Settings 13-6
13.18 Tray Positioning and Tray Addition Sensor Amp Settings 13-6
FK-9F98-07 QP242E Training Text for Service Engineers
6th edition Index [7/8]
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
Technical Support Div. Section No.2
Index-7
13.19 Provisional Proper Data Transmission 13-7
13.20 I/O Check of Each Type of Sensor and Solenoid 13-7
13.21 Prior to Zero Set Adjustment 13-8
13.22 Preliminary Zero Setting 13-8
13.23 TY-axis Zero Set Position Adjustment 13-8
13.24 Shuttle Assembly Y-direction Angle of Orientation Adjustment 13-9
13.25 Shuttle Jaw Front to Back Angle of Orientation Adjustment 13-9
13.26 Shuttle Jaw Parallel Adjustment 13-9
13.27 TZ-axis Zero Set Position Adjustment 13-10
13.28 Zero_Offset_TZ Measurement and Re-calibrating Zero Setting 13-10
13.29 Tray Holder Positioning Adjustment 13-11
13.30 Re-calibrating Zero Setting Prior to Proper Data Measurement 13-12
13.31 Remover_Position_X, Y, Z 13-12
13.32 Remover Lubrication 13-12
13.33 Prior to Connecting the MTU71E 13-12
13.34 MTU71E Connection 13-12
13.35 Tray Holder Levelness and Perpendicular Adjustment 13-13
13.36 Tray Eject Bracket Width & TZ-axis Perpendicular Check 13-14
13.37 TY Cam Clamp Bracket Adjustment 13-14
13.38 Tray Holder Lock Adjustment 13-14
13.39 Max, Min_Limit_Position 13-15
13.40 Original_Posiiton_TZ 13-15
13.41 Guide Rail Adjustment 13-15
13.42 TY-axis Interlock Sensor Adjustment 13-15
13.43 TY-axis Interlock Dog Adjustment 13-16
13.44 TZ-axis Interlock (Shuttle Forward Limit) Sensor Adjustment 1 13-16
13.45 Securing the MTU71E in Place 13-16
13.46 Shuttle Jaw Installation Position Adjustment and
Left to Right Angle Adjustment 13-17
13.47 Original_Posiiton_TY 13-17
13.48 TY-axis Retract Limit (Escape Position) Sensor Adjustment 13-18
13.49 Shuttle Jaw Opening Adjustment 13-18
13.50 Tray Pusher Installation 13-19
13.51 Tray Positioning Sensor Adjustment 13-19