a3369b.pdf - 第51页
Initial Operation 42 VTK - TR -BA- 171e - 1 - User Man u al MDS 3080 -V Step 3 (cartridge base) Mount t he cartridge ba se onto th e fluid b ox. Use MDT 327 or t he MDT 306 - Tor que Wrench Tool VM wi th Bi tVM - A to fi…

Initial Operation
VTK-TR-BA-171e-1 - User Manual MDS 3080-V
41
Options Recommended options
Different models of fluid boxes
Different fluid box connectors
Nozzle heating
Cleaning set
MDT 301 - Universal Tool
MDT 324 – Nozzle Insert Cleaning Holder
If the intended application needs particular accessories (e.g. seals made of special material),
consult our Technical Support at once (see Page 7). Do not start the system in incomplete state.
6.2 First Assembling of the Valve
This chapter describes how to ready your microdispensing system for the first dispensing session.
Always make sure all screw couplings sit tight (torque values in paragraph 3.3.11, page 19).
INFORMATION
Some parts preassembled
Some elements of the equipment are usually delivered in preassembled state. In those cases, you
can omit the respective steps.
Proceed as follows:
Picture Explanation
Step 1 (fluid box body)
Information!
This step will be optional, if you re-assemble the
valve later, since usually you would not remove
the Connector BY from the mounting body.
Place the fluid box body on the receptacle of the
mounting body. Align the bore on the fluid box
body with the bore on the mounting body (see
circles in the first picture). The fluid box body will
sit in the mounting body.
Push the Connector BY through the mounting
body into the bore of the fluid box body. Screw
the Connector BY tight (clockwise) by using an
MDT 327 (for newer revisions of the Connector BY
you can also use a hexagon key 2.5 or the MDT
306 - Torque Wrench Tool VM with the Bit
Hexagon Key 2.5). Torques are depending on the
material of the mounting body (stainless steel 120
– 140 cN.m, PEEK 70 – 80 cN.m).
Important Note!
Do not press the fluid box body while fastening
the Connector BY. Otherwise, the Connector BY
cannot correctly grip into the fluid box body.
Step 2 (O-ring)
Pull the O-Ring-BY over the fluid box body.

Initial Operation
42
VTK-TR-BA-171e-1 - User Manual MDS 3080-V
Step 3 (cartridge base)
Mount the cartridge base onto the fluid box. Use
MDT 327 or the MDT 306 - Torque Wrench Tool
VM with BitVM-A to fix the cartridge base with the
tightening screw by screwing clockwise (torque
110 – 120 cN.m).
Important Note!
There are two types of cartridge base: Cartridge
Base CH (without integrated luer lock) and
Cartridge Base CHI (with integrated luer lock). If
you use a Cartridge Base CH, you need to screw
the Fluid Box Connector Luer Lock into the top
bore of the cartridge base CH. Use the open-
ended wrench of the MDT 327 (hexagon screw
size M8, torque stainless steel 100 – 120 cN.m,
PEEK 40 – 60 cN.m).
Step 4 (tappet sealing)
Push the tappet sealing with the wider side down
onto the pin of an MDT 328. Push the MDT 328
with the tappet sealing straight into the fluid box.
When the tappet sealing sits tight, you will hear a
light noise.
Step 5 (tappet centering piece)
Press the tappet centering piece into the fluid box
body. Use the MDT 328 to make sure the tappet
centering piece is lying straight on the tappet
sealing.
Important Note!
When using a 2G tappet rod, you do not need a
tappet centering piece.
Step 6 (tappet and tappet centering screw)
Screw the Tappet Centering Screw BY into the
fluid box. Do not screw it tight yet. Screw it only
for two rotations.
Push the tappet rod with the tappet spring
slightly into the tappet centering screw. Place a
small droplet of Tappet Grease TF (Order no.
1014637; droplet size ca. 2 mm) on the tappet and
another on the tappet centering screw (for
placing see blue arrows in the picture). Make sure
that the tappet tip is free of grease. Rotate the

Initial Operation
VTK-TR-BA-171e-1 - User Manual MDS 3080-V
43
tappet and pull it in and out for three times to
spread the grease.
Push the tappet spring onto the Tappet Centering
Screw BY.
Push the tappet rod through the tappet spring
into the fluid box. Make sure the tappet goes
through the tappet sealing.
Screw the Tappet Centering Screw BY completely
into the fluid box (torque 100 – 140 cN.m). Use
MDT 303 - Nozzle Insert Changing Tool.
The three small pins of MDT 303 have to fit
exactly into the three holes of the Tappet
Centering Screw BY. Turn the MDT 303 clockwise
while pressing it down slightly to the fluid box.
Combine the MDT 303 with MDT 327 for a better
leverage.
Alternatively, you can use the MDT 306 with
BitVM-B.
Step 7 (nozzle insert)
Use tweezers to pick up the nozzle insert and to
place it onto the fluid box body. Use the small
hole of MDT 327 to press the nozzle insert to
make sure the insert sits flat.
Step 8 (nozzle fixation nut)
Screw the nozzle fixation nut clockwise onto the
fluid box using the MDT 327. Alternatively use the
MDT 306 - Torque Wrench Tool VM with Bit
Hexagon Socket (torque 150 – 180 cN.m).
Step 9 (adjust screw)
Turn the adjust screw completely in the direction
“open” using the MDT 327.
Step 10 (fluid box)
Push the fluid box carefully in a 45° angle onto
the valve.
Make sure that the fluid box sits correctly inside
the valve and touches the frame. There will be a
resistance due to a spring inside the valve.
Straighten the fluid box until it latches in.