00198783-01_AI_Kit_TwinVHF_Gantry_SXV3_de_en.pdf - 第130页

3 Fitting the gantry 3.7 Final Work 130 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Reconfiguration Kit Twin VHF mit Portal Reconfiguration Kit Twin VHF with Gantry 06/2020 3.7.8 Performing Calibration NO…

100%1 / 152
3 Fitting the gantry
3.7 Final Work
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Reconfiguration Kit Twin VHF mit Portal
Reconfiguration Kit Twin VHF with Gantry 06/2020
129
Fig.63: Label BoxPC
1 X1-Vision base interface gantry 1 2 Option: GigE ethernet adapter PCI-E
3 X2 Vision base interface gantry 2
NOTICE
Option
The LAN connections 3 and 4 on the LAN card PCI Express 2xGigabit LAN [03198999‑xx]
are available as an option.
3.7.7 Fitting the Nozzle Changer and Options
Installing the required nozzle changer (head-related)
See also the assembly instructions "Nozzle Changer - SIPLACE SX-
Series" [DEEN:00196578‑xx].
Fitting the stationary cameras (optional)
See also the assembly instructions "Stationary Camera SST 25 – SIPLACE X‑SeriesS and
SX V3" [DEEN:00197710‑xx].
Fitting the component reject bin query (optional)
See also the assembly instructions "Reject Bin Query - for SIPLACE SX1/SX2" [DE
EN:00196615-xx].
Taking into account the component trolley docking unit inner/outer
See also the service manual "SIPLACE SX1/SX2" [DE:00196496‑xx] [EN:00196497‑xx].
3 Fitting the gantry
3.7 Final Work
130 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Reconfiguration Kit Twin VHF mit Portal
Reconfiguration Kit Twin VHF with Gantry 06/2020
3.7.8 Performing Calibration
NOTICE
Information about mapping
For details of mapping, such as the allocation of mapping plates to machine types, see the
technical information "Information about Mapping" [DE:TI2017‑10D04]
[EN:TI2017‑10E04].
Overview
The calibration divides the mapping data and then merges them during the gantry upgrade. In most
cases this means that only a brief calibration procedure needs to be performed (see Fast Hardware
Exchange and flow diagram).
If gantry 1 is fitted, you need to perform PCB/component mapping with the glass plate, irrespective
of the head configuration (gantry 1 is the master gantry).
NOTICE
TwinHead gantry at location 2
If there is a TwinHead gantry fitted at location 2 (gantry 2), the PCB mapping data must be
present. Component mapping can then be performed using the aluminum plate. It is advis-
able to perform a complete PCB/component mapping!
NOTICE
Long Board Option (LBO)
If a gantry is installed on a machine with LBO, this gantry has to be mapped using the Map-
ping with LBO button.
Fig.64: PCB/component mapping
3 Fitting the gantry
3.7 Final Work
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Reconfiguration Kit Twin VHF mit Portal
Reconfiguration Kit Twin VHF with Gantry 06/2020
131
Fig.65: Gantry with TH->component mapping
Confirming the autoconfiguration (SW 713.x)
Fig.66: Select operator level
Select the button.
Select the button.
Switch over to the operator level Ma-
chine service.
ð The button will be shown.