00198783-01_AI_Kit_TwinVHF_Gantry_SXV3_de_en.pdf - 第136页

3 Fitting the gantry 3.7 Final Work 136 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Reconfiguration Kit Twin VHF mit Portal Reconfiguration Kit Twin VHF with Gantry 06/2020 Fig.76: Configuration of head,…

100%1 / 152
3 Fitting the gantry
3.7 Final Work
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Reconfiguration Kit Twin VHF mit Portal
Reconfiguration Kit Twin VHF with Gantry 06/2020
135
Setups
The new gantry configuration of the station configuration is used automatically when new setups
are created.
If the existing setups are to be used in the future then each setup must be changed to match the
gantry configuration.
Fig.75: Modification of gantry configuration in the respective setup
Location 2 can be configured afterwards.
The respective head, cameras, nozzles and tables at location 2 has to be edited.
3 Fitting the gantry
3.7 Final Work
136 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Reconfiguration Kit Twin VHF mit Portal
Reconfiguration Kit Twin VHF with Gantry 06/2020
Fig.76: Configuration of head, cameras, nozzles and tables
Recipes / jobs
If existing recipes and jobs should be used in the future then all of them have to be re-optimized
with the new gantry configuration.
3 Fitting the gantry
3.8 Checklist
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V3 Reconfiguration Kit Twin VHF mit Portal
Reconfiguration Kit Twin VHF with Gantry 06/2020
137
3.8 Checklist
Put this check list in the machine logbook.
Gantry fitted (upgrade)
Step Action Who?
1 Gantry fitted? Customer in line with assembly guide
2 Are the modules fitted in the correct positions? Customer in line with assembly guide
3 Are the correct end position buffers fitted? Customer in line with assembly guide
4 Has the trailing cable been fitted correctly? Customer in line with assembly guide
5 Does the trailing cable run parallel? Customer in line with assembly guide
6 Is the gantry coding correct? Customer in line with assembly guide
7 Is the stationary camera (optional) fitted? Customer in line with assembly guide
8 Are the camera connections connected to the box
PC?
Customer in line with assembly guide
9 Has the nozzle changer been fitted? Customer in line with assembly guide
10 Is the reject bin fitted? Customer in line with assembly guide
11 Have all tools been removed from the machine? Customer in line with assembly guide
12 Are the doors screwed? Customer in line with assembly guide
13 Is the machine switched on and ready for opera-
tion?
Customer in line with assembly guide
14 Have all calibration steps been performed? Customer in line with assembly guide
Date Signature