N7201A654E.pdf - 第18页

NPM- TT2 EJM1EE-MB-01 T-01 What if Troubleshooting 1-1-2 Placement er ror 2 1-1-2 -3 Problem Cause Check/Solution Referen ce Wrong placement Nozzle error Supply unit (feeder or tray) setting error or defect Pickup co ndi…

100%1 / 332
NPM-TT2 EJM1EE-MB-01T-01
1-1-2-2
Problem Cause
Check/Solution Reference
What if
Nozzle error
Error in setting the
height of the placed
component
(interference with the
placed component)
Pickup condition
error
Tape splicing error
Supply unit (feeder
or tray) setting
error or defect
PCB support setting
error
recognition mark
recognition error
Component data
error
Placement
condition error
Solder printing
condition error
(screen printer)
Recognition error
(misalignment, tilt)
1.Check the recognition image
(center and tilt) and an image of
an electrode. Adjust if necessary.
2.If the cover glass of the line
camera is contaminated, wipe it off.
recognition mark
recognition error
Solder printing
condition error
(screen printer)
DGS
Programming
Manual
5
1.Adjust if the recognition mark
setting (coordinate, shape and
imensions) s incorrect.
2.Correct the PCB stop position if
is aligned.
(e.g., check the length f the
placed component extending ff
the board)
Check the printing condition and
adjust the screen printer.
See 1-1-1-2
[Pickup error, Stand pickup]
1-1-1-1 to 1-1-1-2
See [Cannot pickup]
See 1-1-2-1 to 1-1-2-2
[Misaligned placement]
-
-
-
-
-
Component
missing
Misaligned
placement
NPM-TT2 EJM1EE-MB-01T-01
What if
Troubleshooting
1-1-2
Placement error 2
1-1-2-3
Problem Cause
Check/Solution Reference
Wrong placement
Nozzle error
Supply unit (feeder
or tray) setting
error or defect
Pickup condition
error
PCB support
recognition mark
recognition error
Component data
error
Placement
condition error
Solder printing
condition error
(screen printer)
Component
ejection error
PCB recognition
mark data error
Error in setting the
length of the placed
component extending
off the board
The PCB
recognition mark is
contaminated
PCB recognition
error
DGS
Programming
Manual
5
Operating
procedure
4-1-2
-
1.Check the setting value
(applicable value: 0.13 to
0.14MPa) of the cleaning blow
pressure. If it is not within the
value, modify the pressure.
2.Check the nozzle contamination.
If contaminated, clean the nozzle.
Check the length of the placed
component extending off the
board.
Maintenance
4-1-1, 6-4
See 1-1-1-2
[Pickup error, Stand pickup]
1-1-1-1 to 1-1-1-2
See [Cannot pickup]
1-1-1-1 to 1-1-1-2
See [Cannot pickup]
Check for misfeeding of
components, and be sure to mount
correct components.
Operating
procedure
2-4-1
-
-
-
See 1-1-2-1 to 1-1-2-2
[Misaligned placement]
-
Check and adjust the PCB
recognition data (shape set) as
necessary.
Turn OFF the servo switch,
remove the PCB, and clean the
recognition mark.
NPM-TT2 EJM1EE-MB-01T-01
What if
Troubleshooting
1-1-3
Transfer error
1-1-3-1
Problem Cause
Check/Solution Reference
What if
The PCB detection
sensor on the
conveyor does not
detect the PCB.
(There is a cutout or
a slit at a detection
point.)
Error in setting the
length of the placed
component extending
off the board
The PCB detection
sensor on the
upstream process
conveyor does not
detect the PCB.
Two PCBs are
loaded.
The PCB stays on
the conveyor.
The PCB stays on
the entrance of the
upstream process.
PCB transfer error
A belt or a guide is
contaminated.
The PCB detection
sensor on the
conveyor detects
the PCB although it
does not exist.
PCB loading error
The PCB request
signal of the
downstream
process does not
turn OFF within
the PCB unloading
waiting time
PCB unloading
error
Operating
procedure
4-1-2
Maintenance
6-5
Maintenance
6-9
Maintenance
6-9
Check the slit size of the PCB.
(Use within the limit of the notch
allowable dimension.)
1.Check the alignment of the
conveyor coupling to the
downstream process. If
necessary, adjust it.
2.Check the belt or the guide. If it is
contaminated, wipe it off.
Check the length of the placed
component extending off the
board.
Clean the belt or the guide.
Check the sensor for
contamination. If contaminated
wipe it off.
Check the PCB unloading signal
(BA signal) of the upstream
process. Adjust as necessary.
1.Check the alignment of the
conveyor coupling to the
upstream process. If necessary,
adjust the alignment.
2.Check the belt or the guide. If it is
contaminated, wipe it off.
Check the sensor for
contamination.
If contaminated wipe it off.
Check the PCB request signal
(READY signal) of the downstream
Process output.
Check the PCB unloading waiting
time. Adjust if necessary.
-
-
-
-
-
-