00197973-10_SM_MaterialTower.pdf - 第113页
0019797 3 - 10 / 02 , 2016 Z Axis SIPLACE Mat. Towe r St ora ge Serv ice Manual © ASM 6- 31 Fix the shield by using scr ew and washer. Tighten the screw. Plug in al l connectors. Fix the plugs by a cable tie. Fix the cab…

Z Axis 00197973-10 / 02 , 2016
6-30 © ASM SIPLACE Mat. Tower Storage Service Manual
Fix connectors and cables by using cable ties. Fix
the connectors on the hybrid cable side.
Connect the R motor
Fix the shield by using screw and washer and
tighten the screw.
Plug in the three connectors.
Fix the connectors by using a cable tie.
Connect Y axis motor
Slip in the cable.

00197973-10 / 02 , 2016 Z Axis
SIPLACE Mat. Tower Storage Service Manual © ASM 6-31
Fix the shield by using scr
ew and washer.
Tighten the screw.
Plug in all connectors.
Fix the plugs by a cable tie.
Fix the cable by three cable ties (see picture).

Z Axis 00197973-10 / 02 , 2016
6-32 © ASM SIPLACE Mat. Tower Storage Service Manual
Mount cable duct
Lay the hybrid cable into the cable duct,
according to the picture.
Mount the two cable clamps, make sure the
notches of the form clamping parts correspond
to the hybrid cable diameter. Do not tighten the
clamping screws.
Put up the cable duct and fix it with the two or
three upper screws (1). Do not tighten the
screws.
Manually move the gripper to the uppermost
position.
Make a loop with the cable as shown on picture
(1).
Tighten the screws of the upper cable clamp (2),
do not overtighten.
Stretch the hybrid cable in the duct very carefully.
Tighten the screws of the lower cable clamp, do not overtighten.
Screw in the remaining fixing screws of the duct and tighten all five screws.
Fix the hybrid cable along the cable duct by means of cable ties.