00197973-10_SM_MaterialTower.pdf - 第76页
Y Axis 0019797 3 - 10 / 02 , 2016 5- 10 © ASM SIPLACE Mat. Tower St ora ge Ser vice Manu al Machine loading: • All sto red items must be unlo aded in advance. Machine operating cond ition : • Shut d o wn Main electrical …

00197973-10 / 02 , 2016 Y Axis
SIPLACE Mat. Tower Storage Service Manual © ASM 5-9
Before starting the maintenance, read the Safety instructions carefully.
After this modification all stacks must be recalibrated. Therefore
, SIPLACE Material Tower
must be emptied in advance by means of the software.
5.2.2 Tools, Material and Scheduling
For an effective and efficient maintenance, the following resources have to be provided:
Required Tools / Auxiliary Material / Spare parts
Tools: Allen key nr. 1.5, 2, 2.5 and 3
Belt tension meter (frequency range min-max: 20 Hz - 450 Hz), e.g. Sonic Tension
Meter / Gates Corporation Denver, Colorado
Auxiliary
Material:
Loctite Threadlocker Blue 242
Spare parts:
03124536
-01, Y Belt
Time needed
Schedule around 15 minutes for this task.
5.2.3 Prerequisites
For a safe and efficient maintenance, the following prerequisites have to be fulfilled:
Personnel:
• Any work with or at the equipment must be carried out by skilled and
trained personnel in accordance with the locally applicable
regulations.
• Inform all involved persons regarding the currently running
maintenance works.

Y Axis 00197973-10 / 02 , 2016
5-10 © ASM SIPLACE Mat. Tower Storage Service Manual
Machine loading:
•
All stored items must be unloaded in advance.
Machine operating
condition:
• Shut down
Main electrical
power:
• Equipment disconnected from power supply system. The Main Switch
(switched off) locked by means of a padlock to secure the main switch
against unintentional switching on.
Compressed air /
Nitrogen (if used):
• Equipment disconnected from compressed air or nitrogen supply.
Access:
• Open the door on the right side of the machine
• Pull the Z axis towards you
• Pull the gripper up (is a bit hard because the Z motor has a break) so
you have better access to the Y axis
5.2.4 Exchange steps
Step 1
At the right side of the Y axis, slightly loose the
screws of the pulley.
Step 2
By losing the grub screw on the pulley, the Y belt
gets loose.

00197973-10 / 02 , 2016 Y Axis
SIPLACE Mat. Tower Storage Service Manual © ASM 5-11
Step 3
Through the holes on the right side of the Y
plate it's possible to lose the Y belt fixation from
the gripper with the Allen Key.
So manually move the gripper to the right and
loose the two screws for the Y belt fixation. (The
screws are from Bossard B3_M4x12)
Now it's possible to move the gripper to the left
and pull out the Y belt fixation from beyond the
gripper.