00197973-10_SM_MaterialTower.pdf - 第225页

0019797 3 - 10 / 02 , 2016 Option Air Dryer SIPLACE Mat. Towe r St ora ge Serv ice Manual © ASM 11 - 11 Step 11 Fit the connection h ose 8mm between the magnetic valve and the ai r dryer. Step 12 Connect the cable a t th…

100%1 / 274
Option Air Dryer 00197973-10 / 02 , 2016
11-10 © ASM SIPLACE Mat. Tower Storage Service Manual
Step 9
The 4mm hose must make a curve behind the
electric plate. Fit it properly using a cable tie
holder at the existing
hole.
Afterwards the hose has to be passed through
the hole in the drain cover above.
Step 10
Cut and connect the hoses as shown on picture.
00197973-10 / 02 , 2016 Option Air Dryer
SIPLACE Mat. Tower Storage Service Manual © ASM 11-11
Step 11
Fit the connection hose 8mm between the
magnetic valve and the air dryer.
Step 12
Connect the cable at the magnetic valve (colour
not important).
Fit the cable all the way down to the Indel COP.
Change the side at the beginnin
g of the
electronic plate as shown on the picture.
Indel COP connection:
White: Slot 1, X2, 9
Brown: Slot 1, X2, 8
Option Air Dryer 00197973-10 / 02 , 2016
11-12 © ASM SIPLACE Mat. Tower Storage Service Manual
Step 13
Attach the sealing tape at the top and bottom
edge of each door.
Notes:
flush fitting length
pointed edge to the inner side of the door
Alignment as shown on the picture
Attach the sealing tape as well on top of the
portal
frame.
Alignment is not important.
Fit the clamping section on each inner side of
the door.