00197973-10_SM_MaterialTower.pdf - 第210页
Structu re 0019797 3 - 10 / 02 , 2016 10 -2 © ASM SIPLACE Mat. Tower St ora ge Ser vice Manu al Spare parts: 03126682 - 01, C ell pla te including 2 knobs Time needed Schedu le around 10 minutes fo r this task. 10.1.3 Pr…

00197973-10 / 02 , 2016
SIPLACE Mat. Tower Storage Service Manual © ASM 10-1
10 Structure
10.1 Cell Plate
10.1.1 Introduction
This modification instruction describes how to change a cell plate on SIPLACE Material Tower.
Spare part number: 03126682-01
Before starting the maintenance, read the Safety instructions carefully.
After this modification this specific stack must be recalibrated. Therefore, empty this stack of
SIPLACE Material Tower in advance by means of the software.
10.1.2 Tools, Material and Scheduling
For an effective and efficient maintenance, the following resources have to be provided:
Required Tools / Auxiliary Material / Spare parts
Tools: Drilling machine
Drilling bit, diameter 4.6-5.0
Vacuum cleaner
Auxiliary Material: Cover sheets

Structure 00197973-10 / 02 , 2016
10-2 © ASM SIPLACE Mat. Tower Storage Service Manual
Spare parts:
03126682
-01, Cell plate
including 2 knobs
Time needed
Schedule around 10 minutes for this task.
10.1.3 Prerequisites
For a safe and efficient maintenance, the following prerequisites have to be fulfilled:
Personnel:
• Any work with or at the equipment must be carried out by skilled and
trained personnel in accordance with the locally applicable
regulations.
• Inform all involved persons regarding the currently running
maintenance works.

00197973-10 / 02 , 2016 Structure
SIPLACE Mat. Tower Storage Service Manual © ASM 10-3
Machine loading:
• The stored items in this stack must be unloaded in advance.
Machine operating
condition:
• Shut down
Main electrical
power:
• Equipment disconnected from power supply system. The Main Switch
(switched off) locked by means of a padlock to secure the main switch
against unintentional switching on.
Compressed air /
Nitrogen (if used):
• Equipment disconnected from compressed air or nitrogen supply.
Access:
• Open the door on the right side of the machine
• Remove the cover where the cell plate will be replaced
10.1.4 Exchange steps
Step 1
Remove all shelves in the cell plate that needs to
be exchanged.