00197973-10_SM_MaterialTower.pdf - 第223页
0019797 3 - 10 / 02 , 2016 Option Air Dryer SIPLACE Mat. Towe r St ora ge Serv ice Manual © ASM 11 -9 Step 8 Lead the hoses up at the side of the electric plate. U se the existin g holes to plac e cable tie holders.

Option Air Dryer 00197973-10 / 02 , 2016
11-8 © ASM SIPLACE Mat. Tower Storage Service Manual
Step 6
• PU Hose 4 mm
• PU Hose 8 mm
• PU Hose 15 mm
Connect hoses as showed on picture.
Step 7
Place hoses in direction to the electronics plate
as shown in the picture.

00197973-10 / 02 , 2016 Option Air Dryer
SIPLACE Mat. Tower Storage Service Manual © ASM 11-9
Step 8
Lead the hoses up at the side of the electric
plate. Use the existing holes to place cable tie
holders.

Option Air Dryer 00197973-10 / 02 , 2016
11-10 © ASM SIPLACE Mat. Tower Storage Service Manual
Step 9
The 4mm hose must make a curve behind the
electric plate. Fit it properly using a cable tie
holder at the existing
hole.
Afterwards the hose has to be passed through
the hole in the drain cover above.
Step 10
Cut and connect the hoses as shown on picture.