12.1.2 Tools, Material and Scheduling
For an effective and efficient maintenance, the following resources have to be provided:
Required Tools / Auxiliary Material / Spare parts
Tools: Side cutter
Double ladder (small and large)
Wire stripper
Crimping pliers for end sleeves
Long-nose pliers
Set of Allen keys
Set of Phillips screwdrivers
Drilling machine
Metal drill 3 mm
Countersink (diameter max. 10 mm / 90°)
Center punch
Ruler
Pencil
Carpet knife
Vacuum cleaner
Auxiliary Material: Cable Ties
Thread-lock paint red (e.g. ZK1003 EFDEZELL-Lackfarbe)
Wire end ferrules for double wire
Spare parts:
RFNS
-150196-1
00197973-10 / 02 , 2016 Service Door Monitoring
SIPLACE Mat. Tower Storage Service Manual © ASM 12-3
Time needed
Schedule around 4 hours for this task.
12.1.3 Prerequisites
For a safe and efficient maintenance, the following prerequisites have to be fulfilled:
Personnel:
Any work with or at the equipment must be carried out by skilled and
trained personnel in accordance with the locally applicable regulations.
Inform all involved persons regarding the currently running
maintenance works.
Machine loading:
NO item must be unloaded, but the mounting work on a fully loaded
machine can be very cumbersome. Best working condition would be if
the top positions of stack 1 / 3 /5 are unloaded.
Machine operating
condition:
Shut down
Main electrical
power:
Equipment disconnected from power supply system. The Main Switch
(switched off) locked by means of a padlock to secure the main switch
against unintentional switching on.
Compressed air /
Nitrogen (if used):
Equipment disconnected from compressed air or nitrogen supply.
Material Tower
software version:
20.0 or higher.
Access:
Open both service doors.
Service Door Monitoring 00197973-10 / 02 , 2016
12-4 © ASM SIPLACE Mat. Tower Storage Service Manual
12.1.4 Mounting steps
Mechanical preparation
Note:
During the drilling works, take care no
metal chips can get into the machine.
Possibly use the vacuum cleaner to suck
away the metal chips.
On top of each door, two holes have to be drilled
to fix the safety switches and magnets (a total of
8 holes). See
the pictures for the positions of the
holes and mark it using a pencil. Alternatively
cut out the printed drilling jig on the last page of
the door monitoring description, follow the
direction to fold it.
Take a center punch and punch each marked
hole po
sition or punch through the drilling jig.
By means of the power drill and a drill with a
diameter of 3 mm all holes can be drilled.
Countersink all holes from the outer surface so
that the screws are flush with the door surface.
Countersink also the hol
es from the inner
surface for burr removing.