00197973-10_SM_MaterialTower.pdf - 第56页

X Axis 0019797 3 - 10 / 02 , 2016 4- 16 © ASM SIPLACE Mat. Tower St ora ge Ser vice Manu al Step 6 Push the X ax is to the a dis tance where you can measure 600 mm bet ween the beginning of the belt holding and the middl…

100%1 / 274
00197973-10 / 02 , 2016 X Axis
SIPLACE Mat. Tower Storage Service Manual © ASM 4-15
By means of the
nut, tension the belt softly,
meaning that you can pull the long side of the
belt approximately to distance of around 50mm
away.
Now, strongl
y fasten all 8 screws of the belt
holdings.
X Axis 00197973-10 / 02 , 2016
4-16 © ASM SIPLACE Mat. Tower Storage Service Manual
Step 6
Push the X axis to the a distance where you can
measure
600 mm between the beginning of the
belt holding and the middle of the pulley.
Required tension for the X belt is
36 Hz ± 1 Hz
Measure the belt tension approximately in the
middle of the measuring distance. Turn the belt
tension nut accordingly to achieve the correct
tension.
00197973-10 / 02 , 2016 X Axis
SIPLACE Mat. Tower Storage Service Manual © ASM 4-17
Fasten the five screws that are retaining the belt
tensioner.
Step 7
To exchange the belt at the top proceed
similarly as describe
d in Step 2 - 6.