Setting up and commissioning User manual SIPLACE X-series Setting up the machine From software version SR.70x.xx 01/2011 EN edition 252 4.3.9 Fitting the input conveyor 4.3.9.1 T ools – Allen keys, DIN 91 1, set – Philli…

100%1 / 448
User manual SIPLACE X-series Setting up and commissioning
From software version SR.70x.xx 01/2011 EN edition Setting up the machine
251
Check the switch settings for S1
1: ON
2: Not used
4.3.8.7 Fitting the axis unit
Carefully lift the axis unit onto the rail in the extension kit.
Make sure that you do not squash any cables.
Push the axis unit into the extension kit as far as the stop.
Secure the axis unit with the fillister head screw.
Insert the cover.
Fix the grounding cable to the doors (item 2 in Fig. 4.3 - 8
, page 239),
as shown in Fig. 4.3 - 9
on page 242.
Lock the doors.
4.3.8.8 Fitting the side plates
Fix the grounding cable to each side plate (item 6 in Fig. 4.3 - 8, page 239), as shown in Fig.
4.3 - 9
page 242.
Fix the side plate to the machine frame with 6 fillister head screws.
PLEASE NOTE 4
If you have dismantled the output conveyor, continue from Section 4.3.9
" Fitting the input con-
veyor" on page 252.
Once the input conveyor is fitted, then continue the assembly work from Section 4.3.14
"Fitting
the indicator lamp" on page 268.
X09_3sq X09_3sq 03050896 Snap connector into place
X10_3sq X10_3sq 03050895 Snap connector into place
X11_3sq X11_3sq 03050906 Snap connector into place
X12_3sq X12_3sq 03050905 Snap connector into place
X30_1sq X30_1sq 03010054 Screw tightly
X30_2sq X30_2sq 03010054 Screw tightly
Axis unit, plugs Connecting cable Please note
Plug Cable
Setting up and commissioning User manual SIPLACE X-series
Setting up the machine From software version SR.70x.xx 01/2011 EN edition
252
4.3.9 Fitting the input conveyor
4.3.9.1 Tools
Allen keys, DIN 911, set
Phillips screwdriver, size 1
4.3.9.2 Assembly
4
Fig. 4.3 - 14 Input conveyor - dual conveyor
(1) Rail, input conveyor
(2) rail, processing conveyor 1
(3) Cable cover 20 x 200
(4) Countersunk screw, ISO 7046, M3x6, 2x per cable cover
(5) Cable cover 20 x 310
(6) Fillister head screw DIN 912, M3x5, 1x per cable cover
(7) Fillister head screw DIN 912, M6x16, and washer, 4x per rail
(8) Guide for hexagonal shaft
(9) Hexagonal shaft (single conveyor: one, dual conveyor: two)
(10) Drive unit
User manual SIPLACE X-series Setting up and commissioning
From software version SR.70x.xx 01/2011 EN edition Setting up the machine
253
Remove the cable covers (items 3 and 5 in Fig. 4.3 - 14, page 252) from the input conveyor
(item 1 in Fig. 4.3 - 14
, page 252).
Carefully place the rail (item 1 in Fig. 4.3 - 14
, page 252) against the rail on the processing
conveyor (item 2 in Fig. 4.3 - 14
, page 252).
CAUTION 4
Be careful not to cut through any of the light barrier or drive motor cables.
Fix each rail using 4 fillister head screws M6x16 and the associated washers (item 7 in Fig.
4.3 - 14
, page 252).
Connect the power cable to the light barriers and drive motors.
Fix the cable covers in place (item 3 and 5 in Fig. 4.3 - 14
, page 252).
Introduce the hexagonal shaft (item 9 in Fig. 4.3 - 14
, page 252) into the drive unit (item 10 in
Fig. 4.3 - 14
, page 252).
Make sure that the hexagonal shaft guide (item 8 in Fig. 4.3 - 14
, page 252) always points
towards the conveyor side wall to which the drive unit (item 10 in Fig. 4.3 - 14
, page 252) is
fixed.