CP40 service manual.pdf - 第63页
0. Install & Driver (CP-40) Version Date WA QA CA Note 00 Nov04 O O O

0. Install & Driver
(CP-40)
Version Date WA QA CA Note
00 Nov04 O O O
X-Clamp
X-ClampY-Clamp
Y-Clamp
X-Clamp

0. Install & Driver
(CP-40)
Version Date WA QA CA Note
00 Nov04 O O O

0. Install & Driver
(CP-40)
Version Date WA QA CA Note
00 Nov04 O O O
< Level Setting >
1. LEVELER
: Use 100mm width measuring machine that is
possible to acquire 0.02(mm/m) of precision.
2. Installation method of leveler (Differ by contacting part)
: The leveling should be performed at the level of being on the surface but less than 30% of bottom is being
contacted to the ground when installed on the LM-RAIL
-> The condition of leveling is differed by the installation location of leveler.
Contacting rate : 28% Contacting rate : 12%
3. Installation location of leveler
: The leveling condition is differed by the installation location of leveler and location head and X-frame.
-. Back & Forth: Install it vertically (back & forth) to center of Y1 and Y2 rails.
-. Right & Left: Install to the center of Feeder Base on the front.
Special attention is required to prevent interference by locating the Hole cap of center on center groove of the leveler.
100mm