CP40 service manual.pdf - 第66页

0. Install & Driver (CP-40) Version Date WA QA CA Note 00 Nov04 O O O 2.0 -. Stan dard 0.05mm/m : within 2.5 of leveler scale => Set within 2.0 (Leveler error, Measurement error) -. Levelin g is required after the…

100%1 / 250
0. Install & Driver
(CP-40)
Version Date WA QA CA Note
00 Nov04 O O O
Locate the head
to the center
Placeittothe
location that 9 LM
Rail volts are shown.
Placeittothelocation
that 11 LM Rail volts
are shown.
Placeittothelocation
that 11 LM Rail volts
are shown.
Place the center of the
hole cap on the groove
of the leveler
0. Install & Driver
(CP-40)
Version Date WA QA CA Note
00 Nov04 O O O
2.0
-. Standard 0.05mm/m
: within 2.5 of leveler scale
=> Set within 2.0 (Leveler error, Measurement error)
-. Leveling is required after the movement of equipment
(To prevent the transformation by leaving without leveling)
- The party who move the equipment has to perform the leveling.
0. Install & Driver
(CP-40)
Version Date WA QA CA Note
00 Nov04 O O O
*Note
Surface of Chip Mounter
1)X-Y moving surface of Head
2)Feeding surface of Feeder
3)PCB placing surface
(Conveyor surface)
4)ANC surface
*Note
: If Nut tightening is poor,
the nut will be loosen due
to vibration of machine so
the machine can't keep its
level.