CP40 service manual.pdf - 第92页
1. Head Part (CP-40) Version Date WA QA CA Note 00 Nov04 O O O 1. Move Head to the Rear Acryl Cover. 2. Put Off Power Switch. 3. Remove Air. 4. Disconnect Four Bolts from the Upper Cover of Head I/F Board. 5. Disconnect …

1. Head Part
(CP-40)
<Assembly>
1. Move Head to Front Feeder Base and Secure Two Bolts and a Filter on the Front of Cover.
2. Move Head to Rear Feeder Base and Secure the Rest Two Bolts.
Version Date WA QA CA Note
00 Nov04 O O O

1. Head Part
(CP-40)
Version Date WA QA CA Note
00 Nov04 O O O
1. Move Head to the Rear Acryl Cover.
2. Put Off Power
Switch.
3. Remove Air.
4. Disconnect Four Bolts from the Upper Cover of Head I/F
Board.
5. Disconnect Head CN11~13(Solenoid Cable) and
CN14~16(Generator Cable).
CN11~CN16
HEAD I/F BOARD
J9800392
Head I/F Cover
J7152011B
1-3-5. Vacuum Generator Replacement

1. Head Part
(CP-40)
Fitting #1
Fitting #2
M4 Hexagon Wrench
Bolt * 2ea
Φ
3NUT*2ea
M4 Hexagon Wrench
Φ
6Spanner
7. Loosen Two
Φ
3 Nuts Using
Φ
6 Spanner.
With 3mm Wrench, Loosen Two M3*8 Hexagon
Wrench Bolts.
6. Disconnect Fitting #1 and #2 from Vacuum
Generator.
Version Date WA QA CA Note
00 Nov04 O O O