mä~ëã~ä~Ä= póëíÉã=NMM lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó== System Manual OKN= dÉåÉê~ä= The services requirements for the mä~ëã~ä~Ä= póëíÉã=NMM= are given in two appendices to this manual: Appendix S Services Specificat…

System Manual lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó== mä~ëã~ä~Ä=póëíÉã=NMM
OK= pÉêîáÅÉë=Ef`m=NUM=C=~ìíçã~íáÅ=äç~Ç=äçÅâF=
2.
Services (ICP 180 & automatic load lock) ...................................................................................2-1
2.1 General....................................................................................................................................................2-2
2.2 Services requirements ............................................................................................................................2-3
2.3 Distribution and use of Nitrogen vent and turbo purge gas..............................................................2-3
2.4 Services diagrams ...................................................................................................................................2-4
Fig 2.1: System 100 (ICP 180/380) services flow diagram..................................................................................2-5
Fig 2.2: System 100 pneumatic circuit diagram.................................................................................................2-6
Services (ICP 180 and Automatic Load Lock)
Printed 25 May 2005 10:12 Page 2-1 of 6 Issue 2: February 02

mä~ëã~ä~Ä=póëíÉã=NMM lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó== System Manual
OKN= dÉåÉê~ä=
The services requirements for the mä~ëã~ä~Ä=póëíÉã=NMM=are given in two appendices to this
manual:
Appendix S Services Specifications for mä~ëã~ä~Ä=and fçåÑ~Ä Systems. This document
gives generic information and mandatory requirements for all services.
Appendix I mä~ëã~ä~Ä=póëíÉã=NMM Installation Data Sheets. This document gives the
information necessary to prepare the environment for the mä~ëã~ä~Ä=
póëíÉã=NMMK= Services information includes electrical power consumption
and cooling water flow rates. References are made to the relevant
mandatory services requirements, listed in ‘Services Specifications for
mä~ëã~ä~Ä=and fçåÑ~Ä Systems’ (see Appendix S).
Services diagrams of the mä~ëã~ä~Ä=póëíÉã=NMM=(ICP 180 + automatic load lock) are given in
the following drawings:
SP91C24171 System 100 (ICP 180) Services flow diagram
SP91B24018 System 100 Pneumatic circuit
These drawings are located in Volume 2 of this manual. Illustrations of these drawings are
also given in sub-section 2.4, page 2-4.
Services (ICP 180 and Automatic Load Lock)
Issue 2: February 02 Page 2-2 of 6 Printed 25 May 2005 10:12

System Manual lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó== mä~ëã~ä~Ä=póëíÉã=NMM
OKO= pÉêîáÅÉë=êÉèìáêÉãÉåíë=
For details of the services requirements, refer to Appendix IDS and Appendix S.
OKP= aáëíêáÄìíáçå=~åÇ=ìëÉ=çÑ=káíêçÖÉå=îÉåí=~åÇ=íìêÄç=éìêÖÉ=Ö~ë=
Nitrogen (N
2
) is supplied to the system via the services panel to allow the process chamber,
foreline and automatic load lock to be filled during system venting and to provide a purge
gas supply to the turbo pump (if fitted). The N
2
distribution circuit is shown in the services
flow diagram; see the following paragraph.
The services flow diagram of the mä~ëã~ä~ÄpóëíÉã=NMM=(ICP 180)=are given in drawing 94-
SP91C24171. This drawing is located in Volume 2 of this manual. An Illustration of this
drawing is also given at the rear of this Section.
Nitrogen enters the system at the services panel through a ¼” Swagelok bulkhead connector.
It is then fed to a regulator and pressure gauge (located behind a panel to prevent
unauthorized adjustment) via a stainless steel pipe. The outlet pressure of the regulator can
be manually adjusted. To set up the outlet pressure of the regulator, refer to ‘Operator
Adjustments’ in Section 5.
The outlet from the regulator is connected to:
a) A check valve (over-pressure relief valve).
b) The turbo pump purge line (if a turbo pump is fitted).
c) If a Maglev turbo pump is fitted, directly to the turbo pump (for use by the Alcatel
turbo controller during system venting).
d) The process chamber vent line.
e) The foreline vent line.
f) The automatic load lock vent line.
`ÜÉÅâ=î~äîÉ=
The check valve is installed to limit the maximum pressure that the regulator can supply. The
valve is normally closed and will open at pressures above 5 psi. The outlet of the check valve is
fed to the air out connector on the services panel to allow any excess nitrogen to be piped
out of the cleanroom if required.
WARNING
IN A NORMALLY VENTED ROOM, THERE IS A LOW RISK OF ASPHYXIA DUE TO VENT
GAS DISPLACING AIR.
USERS SHOULD MAKE THEIR OWN RISK ASSESSMENT.
DO NOT REMOVE THE CHECK VALVE OR CAP THE AIR OUT CONNECTOR; THIS WOULD
COMPROMISE A SYSTEM SAFETY FEATURE.
qìêÄç=éìãé=éìêÖÉ=äáåÉ=
The turbo purge line supplies nitrogen to the turbo pump purge gas inlet via a mass flow
meter, restrictor and the turbo purge valve. The mass flow meter’s readback is monitored by
the PC 2000 software. If the nitrogen flow is too low, this state is detected by the PC 2000
Services (ICP 180 and Automatic Load Lock)
Printed 25 May 2005 10:12 Page 2-3 of 6 Issue 2: February 02