ALFeeder_E.pdf - 第72页
2. Preaparation for operation 3-26 Chapter 3 Setting up 3. Close the clamp unit and move the loading unit just before the end to make it not open. 4. While pressing the tape clamp lever , insert the component tape to the…

2. Preaparation for operation
3-25
Chapter 3 Setting up
3
Scan the component tape (reel) ID.
Scan the ID of component tape (reel) to be added with bar code reader.
Scanning component tape (reel) ID
Set position is specified
by this ID.
64308-KLU-30
4
Set Auto loading feeder.
The reel scanned in Step 3 is specified and LEDs on feeder flash continuously.
1. Set Auto loading feeder to the feeder set position where LEDs flash continuously.
2. Set preset holder to feeder exchange carriage or reel holder for feeder bank.
TIP
See Step3 of "2.2.1 Setting up component tape without IT Option" for preset holder setting procedure.
5
Set a tape reel, to be added newly or to be supplied, to preset holder.
6
Set the component tape to the loading unit.
1. While pressing down the tape clamp lever and pull the loading unit to front end.
2. (If the 1st reel spplies components) the clamp unit opens left and right by releasing the tape
clamp lever, the component tape in operation is fallen down below the loading unit.
Pulling out loading unit
Moving down the component tape in operation
Clamp unit opens
by releasing tape clamp lever
Tape clamp lever
Loading unit
Tape component
in operation
Tape component
in operation
63331-KLU-00

2. Preaparation for operation
3-26
Chapter 3 Setting up
3. Close the clamp unit and move the loading unit just before the end to make it not open.
4. While pressing the tape clamp lever, insert the component tape to the loading unit, then insert
the top of component tape to the set area as shown in the figure below.
Setting component tape
Loading unit
Component tape
to be added
Component tape in operation
Tape clamp lever
Keep pressing down
tape clamp lever
Tape set area
Clamp unit
Set top of component
tape in this area
63305-KLU-50
5. Insert the loading unit into feeder body and release the tape clamp lever.
Inserting loading unit
Loading unit
Tape clamp lever
63332-KLU-00
n
NOTE
A loading error may occur unless the loading unit is inserted into the end.

2. Preaparation for operation
3-27
Chapter 3 Setting up
7
Check the component tape setting.
The component tape is set correctly if the followings are applied.
1. The yellow LED lights up for 1 second if the component tape insertion is detected.
2. The yellow and green LEDs flash simultaneously for 4 seconds.
<When supplying a component tape>
Check [Monitor] - [Production] screen. The feeder set position is enclosed with a magenta frame
when "presettable".
3. The green LED lights up after completing the component tape setting.
<When supplying a component tape>
The magenta frame disappears when the set for "presettable" is completed.
Yellow and green LEDs
flash simultaneously
for 4 seconds
Yellow LED lights up
for 1 second
Completing
Completing component tape setting
With IT Option
Magenta frame disappears
Before completing
After completing
Green LED lights up
[Monitor] - [Production] screen
63307-KLU-30
8
Start the operation.
When the reel was newly set.
Pressing [START] button loads component tape, set in the loading unit, to pickup position and starts
operation.
When the reel was preset.
If the component tape in operation becomes empty, other component tape set in the loading unit
loads to pickup position and supplying component is continued.