3.2 "Machine Performance Data" T ab 0403-001 4-15-1 AIM01EDTP (13) W arm-up run (T est Mode) The data of the warm-up run (dry cycle) is counted. P .C.B. counter The number of P .C.B.’s is counted when the machi…

100%1 / 385
(3) Passed P.C.B.
The number of passed P.C.B.’s is counted when the machine is
set in the "PASS" mode.
Counting is implemented when the P.C.B. transfer starts (when a
P.C.B. on the X/Y table is transferred to the output conveyor).
(4) Product P.C.B. (B.B.R.)
Shown is the number of defective P.C.B.'s summed up when the
unit P.C.B. B.B.R. detection function (option) is used.
(5) Total components
Shown is the number of picked components (the number of pick-
up operations).
(6) Total handling errors
Shown is the total number of component handling errors.
(7) Rate of handling errors (%)
Shown is the percentage of handling errors per total number of
picked components.
(8) Shortage of component
Shown is the total number of detected component shortage er-
rors.
(9) Waste components
Shown is the total number of components that were picked up
but not placed.
The indicated number of components represents the compo-
nents that were not placed due to a vertical component error
(sensor), a component recognition error, a component thick-
ness error, interrupted production, the detection of unit P.C.B.
(B.B.R.) (option), etc.
(10) Component backtrack
Shown is the total number of component backtrack errors.
(11) Component output error (Pickup error)
Shown is the total number of the output-error-caused compo-
nents (pickup errors).
(12) Component output error (Others)
Shown is the total number of output-error-caused components
(errors other than pickup ones).
3.2 "Machine Performance Data" Tab
0510-003 4-15 AIM01EDTP
Note
3.2 "Machine Performance Data" Tab
0403-001 4-15-1 AIM01EDTP
(13) Warm-up run (Test Mode)
The data of the warm-up run (dry cycle) is counted.
P.C.B. counter
The number of P.C.B.’s is counted when the machine is operated
under the following condition.
"ENABLE" set for "TEST RUN" in "Run Mode" Tab Sheet ("OPN.
MODE" Window)
"PCB XFR Err Det Disabled" Check Box Checked
(State in which no P.C.B. is put in and out)
Not Picked Counts
The number of non-handling/non-placement actions is counted
when the machine is operated under the following condition.
"ENABLE" set for "TEST RUN" in "Run Mode" Tab Sheet ("OPN.
MODE" Window)
"Handling/Place Disabled" and "Vacuum/Blower Disabled"
Check Boxes Checked
The number of non-handling and placement actions is counted
although the rotary turret takes running actions.
Note
(14) Power on time
Shown is the time when the control power of the machine is ON.
Sample Display
10:03' 50" (10 hours, 3 minutes, 50 seconds)
Auto run time
Shown is the time when the machine was running automatically.
When a pattern program is set as the current one several times,
the sum total is computed.
Placement time
Shown is the time required to finish a P.C.B. (from first to last
component placement on a product P.C.B.).
The essential component placement time is summed up.
While the machine is set in the "STOP" or the "PAUSE" mode
or a step operation is performed, the time is not measured.
This is used to calculate the average placement tact time per
component.
P.C.B. transfer time
Shown is the period of time during which each motor (motors to
drive the L conveyor, the transfer conveyor, the P.C.B. transfer,
and the R conveyor) is being activated.
P.C.B. wait
Input wait
Shown is the time measured when the machine is completely
in the waiting mode (the machine is waiting for a P.C.B. to be
loaded from the input machine).
Output wait
Shown is the time measured when the machine is completely
in the waiting mode (the machine is waiting for a P.C.B. to be
unloaded to the output machine).
P.E.C./B.B.R.
Shown is the period of time during which the machine is taking
P.E.C. recognition and B.B.R. detection actions.
Counted is the period of time during which the X/Y table starts
moving and the P.E.C. recognition and B.B.R. detection are com-
pleted.
Others
Shown is the period of time during which the machine takes ac-
tions other than the above-described ones.
Included are the periods of time during which the F-axis takes
actions before component placement, the X/Y table returns af-
ter component placement, etc.
3.2 "Machine Performance Data" Tab
0403-002 4-16 AIM01EDTP
Note
Note