OperationInstruction_Vsision XP.pdf - 第39页

Vision XP+ V AC Page 31 3 From Tr ansport to Initial Start-Up 3.1 T ransport Configuration and T ransport Operating Instructions V ersion 1.5 T rans port with Crane Fig. 3-4 T ranspo rt with Crane Girder Padded Side P an…

100%1 / 214
Page 30 Vision XP+ VAC
3 From Transport to Initial Start-Up
3.1 Transport Configuration and Transport
Operating Instructions
Version 1.5
3.1.3 Transport in Basic Packaging
Dimensions
Fig. 3-1 Dimensions
Length (A), width (B) and height (C) are specified in the installation plan. Ap-
proximately 100 mm must be added to the dimensions specified in the instal-
lation plan.
Transport with Two
Forklifts or Pallet Jacks
Fig. 3-2 Transport with Two Forklifts or Pallet Jacks
Transport with One
Forklift or Pallet Jack
Fig. 3-3 Transport with One Forklift or Pallet Jack
Danger of Tilting
Vision XP+ VAC Page 31
3 From Transport to Initial Start-Up
3.1 Transport Configuration and Transport
Operating Instructions
Version 1.5
Transport with Crane
Fig. 3-4 Transport with Crane
Girder
Padded Side Panels
Page 32 Vision XP+ VAC
3 From Transport to Initial Start-Up
3.1 Transport Configuration and Transport
Operating Instructions
Version 1.5
3.1.4 Transport in the Wooden Crate
Dimensions
Fig. 3-5 Dimensions with Wooden Crate
Length (A), width (B) and height (C) are specified in the installation plan. Ap-
proximately 400 mm must be added to the dimensions specified in the instal-
lation plan.
Transport in Wooden
Crate with Two Forklifts
or Pallet Jacks
Fig. 3-6 Transport in Wooden Crate with Two Forklifts or Pallet Jacks
Transport in Wooden
Crate with One Forklift
or Pallet Jack
Fig. 3-7 Transport in Wooden Crate with Forklift or Pallet Jack
A
C
B
Danger of Tilting