N7201A304E05(1)_0.pdf - 第95页

NPM LNB 3.1 Production Management Information EJM9BE-MB-03L-20 Page 3-3  Change to the shift information list 1. Change to the shift information list 1 Choose [Shift Information]. • The <Shift Information> list is…

100%1 / 170
NPM
LNB
3.1 Production Management Information
Page 3-2 EJM9BE-MB-03L-20
3.1 Production Management Information
3.1.1 Browsing the Production Management Information
You can browse the production management information.
The production management information that LNB controls is compiled by lot and by shift.
Even if production management information is cleared on the machine screen during the
compiling, compiled data in LNB is not cleared but accumulated constantly.
The production management information displayed on LNB contains data compiled prior to
clearing and therefore is different from that of the machine which only contains only the data
compiled after clearing.
Type
Description
By lot
The process of compiling continues as long as the same production data is
downloaded. It is cleared at the time of changeover. The time of changeover is
a time when LNB starts to download production data different from the one
that is currently downloaded.
By shift
The process of compiling continues during the set shift in the timetable setting.
It is cleared when the shift is changed.
1
Choose [Management Data] from the
menu.
The list of production data is displayed.
A) When the displayed information is <Lot information> list
2
Select the desired production
information from the lot information
list.
The past one week’s production management
information of the selected lot is displayed in
the new window.
LNB3-1003_E
lnb3-1002_e
2
lnb3-1001_e
1
NPM
LNB
3.1 Production Management Information
EJM9BE-MB-03L-20 Page 3-3
Change to the shift information list
1. Change to the shift information list
1
Choose [Shift Information].
The <Shift Information> list is displayed.
2. Change to the information-for-clearing list
1
Choose [Information for clearing].
The <Information for clearing> list is
displayed.
lnb3-1002_e
1
lnb3-1004_e
lnb3-1002_e
1
lnb3-1005_e
NPM
LNB
3.1 Production Management Information
Page 3-4 EJM9BE-MB-03L-20
B) When the displayed information is <Shift Information> list
2
Select the desired shift information
from the shift information list.
The past one week’s production management
information of the selected shift is displayed in
the new window.
LNB3-1006_E
lnb3-1004_e
2