N7201A304E05(1)_0.pdf - 第97页

NPM LNB 3.1 Production Management Information EJM9BE-MB-03L-20 Page 3-5  Changing the list information 1. Change to the lot information list 1 Choose [Lot Information]. • The <Lot Information> list is displayed. 3…

100%1 / 170
NPM
LNB
3.1 Production Management Information
Page 3-4 EJM9BE-MB-03L-20
B) When the displayed information is <Shift Information> list
2
Select the desired shift information
from the shift information list.
The past one week’s production management
information of the selected shift is displayed in
the new window.
LNB3-1006_E
lnb3-1004_e
2
NPM
LNB
3.1 Production Management Information
EJM9BE-MB-03L-20 Page 3-5
Changing the list information
1. Change to the lot information list
1
Choose [Lot Information].
The <Lot Information> list is displayed.
3. Change to the information-for-clearing list
1
Choose [Information for clearing].
The <Information for clearing> list is
displayed.
lnb3-1002_e
lnb3-1004_e
1
lnb3-1004_e
1
lnb3-1005_e
NPM
LNB
3.1 Production Management Information
Page 3-6 EJM9BE-MB-03L-20
C) When the displayed information is <Information for clearing> list
2
Select the desired machine display
information from the
information-for-clearing list.
The past one week’s production management
information of the selected information is
displayed in the new window.
LNB3-1007_E
lnb3-1005_e
2