NPM LNB 3.1 Production Management Information EJM9BE-MB-03L-20 Page 3-7  Changing the list information 1. Change to the lot information list 1 Choose [Lot Information]. • The <Lot Information> list is displayed. 2…

100%1 / 170
NPM
LNB
3.1 Production Management Information
Page 3-6 EJM9BE-MB-03L-20
C) When the displayed information is <Information for clearing> list
2
Select the desired machine display
information from the
information-for-clearing list.
The past one week’s production management
information of the selected information is
displayed in the new window.
LNB3-1007_E
lnb3-1005_e
2
NPM
LNB
3.1 Production Management Information
EJM9BE-MB-03L-20 Page 3-7
Changing the list information
1. Change to the lot information list
1
Choose [Lot Information].
The <Lot Information> list is displayed.
2. Change to the shift information list
1
Choose [Shift Information].
The <Shift Information> list is displayed.
lnb3-1002_e
lnb3-1005_e
1
lnb3-1005_e
1
lnb3-1004_e
NPM
LNB
3.1 Production Management Information
Page 3-8 EJM9BE-MB-03L-20
3.1.2 Explanations of Production Information Names
Names of information displayed as the production management information are described below.
A) Lot information
Name Explanation
a Lot name The name of the production lot
b Period The time during which production management information to be
displayed is compiled
Maximum of one week
B) Shift information
Name Explanation
a Shift name The name of the production shift
b Period The time during which production management information to be
displayed is compiled
Maximum of one week
C) Lot list
Name Explanation
a From The production start time of the corresponding lot during the target
shift
b To The production end time of the corresponding lot during the target
shift
c (Lot name) The name of the production lot during the target shift
D) Machine display information
Name Explanation
a Machine Information The timing when production management information to be
displayed is acquired
b Lot name The name of the production lot
c Date The time when production management information to be displayed
is acquired
LNB3-1008_E
a
b
LNB3-1009_E
a
b
LNB3-1015_E
a
b
c
LNB3-1016_E
a
b
c