Workflow with Flexible Family Setup
Editing Production Schedules
ASM Material Setup Assistant 2.3 (R17-1) ASM Material Setup Assistant 2.3 (R17-1) 193
Compressing
The action Compress eliminates time gaps between jobs. The approved jobs in the timeline are
collected together so that no additional pauses exist. The Dialog - Compress dialog box will open.
► Select the setting in this dialog box which is to be used for compressing.
5.3
5.3 Editing Production Schedules
Editing Production Schedules
Scheduled and non-approved production schedules can be edited.
► Go to the View toolbar and select the Editing icon.
⇨ Switches over to the Edit view.
Production Order Manager – editing production schedules
Refer to View - Edit to see the available Filters and Actions for editing production schedules.
Workflow with Flexible Family Setup
Editing Production Schedules
194 ASM Material Setup Assistant 2.3 (R17-1) ASM Material Setup Assistant 2.3
How to edit productions schedules
▪ Deleting production jobs
– You can only delete production jobs which have not yet been started or which have already been
completed.
– The production jobs are deleted completely from the system. This may be necessary if you im
-
ported the wrong jobs from SIPLACE Pro.
▪ Recalling production jobs
– The recalling of production jobs may be necessary if you want to change the order or the start/
end times later on.
– Recalled production jobs remain in the system and are marked with the status Planned.
– You can only recall approved production jobs if the production has not yet started on the line.
NOTICE
Observing notifications
If subsequent production jobs are affected by these changes, a notification will be issued ac
-
cordingly.
WARNING
Deleting and recalling production jobs
When deleting and recalling production jobs, there may be problems if the picking or presetup
tasks have already been started. You may need to manually identify, tear down and put back
into the warehouse the materials concerned. If the picking and/or the presetup for the affected
production jobs has already been started, a warning will be issued accordingly.
NOTICE
Reapproving production schedules
After processing the production schedules, these need to be approved again. The production
schedule will be updated with the changes made.
Workflow with Flexible Family Setup
Approving Production Schedules
ASM Material Setup Assistant 2.3 (R17-1) ASM Material Setup Assistant 2.3 (R17-1) 195
5.4
5.4 Approving Production Schedules
Approving Production Schedules
Production schedules for which scheduling has been completed, must be approved. Non-approved pro
-
duction schedules can be edited. Approved productions schedules can be called back. See also View -
Edit.
► Go to the View toolbar and select the Approval icon (1).
⇨ Switches over to the Approval view. In the Approval view you can approve the scheduled jobs for pro
-
duction.
Production Order Manager – start approval
► Select one or more production jobs and approve these with the action Approve (2).
⇨ If a production job is marked, all production jobs before this one, which have not yet been approved,
will also be marked and approved.
⇨ Notifications are issued in the notifications window. Observe these messages and perform any tasks
requested.