00198227-03_UM_MaterialSetupAssistant_2.3-R17-1_DE_EN.pdf - 第203页
Workflow with Flexible Family Setup Viewing the Material Demand ASM Material Setup Assistant 2.3 (R17-1) ASM Material Setup Ass istant 2.3 (R17-1) 203 5.6 5 . 6 V ie w in g t h e M a t e r ia l D e m a n d Viewing the Ma…

Workflow with Flexible Family Setup
System Status after Production Schedule Approval
202 ASM Material Setup Assistant 2.3 (R17-1) ASM Material Setup Assistant 2.3
5.5.4
5.5.4 ASM Material Manager
ASM Material Manager
► Open the ASM Material Manager.
► Select the Material demand list (1) view.
ASM Material Manager - Material Requirement List
The material demand lists (2) are generated for approved production jobs with a common setup. The
required material demand per setup is determined and the picking lists generated for each table/location.
► The next step is to pick the material needed for the production job from the warehouse with the PDA.
See also "5.7 Executing and Monitoring Material Picking" [ ➙ 205].
NOTICE
Only with ASM Material Manager - full version
Material demand lists can only be created with the ASM Material Manager - full version.

Workflow with Flexible Family Setup
Viewing the Material Demand
ASM Material Setup Assistant 2.3 (R17-1) ASM Material Setup Assistant 2.3 (R17-1) 203
5.6
5.6 Viewing the Material Demand
Viewing the Material Demand
In Order Manager – Monitoring, you can view the materials needed for the selected setup. You get a
quick overview of the required material needed for this setup in the pre-setup area.
► Mark the setup and right-click with the mouse.
⇨ The context menu will be opened.
Setup preparation - context menu
► Select the function Show Material Demand.
⇨ The Show Material Demand dialog box will be shown.
► For a description of the individual parameters, refer to Dialog - Material Demand.

Workflow with Flexible Family Setup
Viewing the Material Demand
204 ASM Material Setup Assistant 2.3 (R17-1) ASM Material Setup Assistant 2.3
5.6.1
5.6.1 Material Requirement in ASM Material Manager
Material Requirement in ASM Material Manager
In the packaging unit information of the ASM Material Manager, information on the material reuse are
entered and displayed.
► Start the ASM Material Manager.
► In the tree view, select Material Management => Packaging Unit (1).
⇨ In Material Management => Packaging Unit, the attributes (2) for the material reuse of the relevant
packaging units are displayed.
ASM Material Manager – Packaging unit information
Attribute Description
Current setup The setup for which the current packaging units
are planned.
Current Setup Instance Task IDs of the presetup task.
Planned Setup The setup for which the packaging unit will be used
next.
Planned Setup Instance Task IDs of the presetup task.
Material reuse Not required: Material that is no longer needed in
the presetup area or on the line. The material
should be torn down and put back in the ware
-
house.
Required: Material that is needed in the presetup
area or on the line.
Recalculate: Material that is no longer needed on
this line but that can be used on another line. The
status needs to be recalculated.
Constant: The packaging unit is used on a con
-
stant setup or a fixed table.
Ignored: The packaging unit is ignored by the
SIPLACE Material Setup Assistant.