EUKYX-199-2100_G5S2_Instruction_Vol2_E.pdf - 第151页
EUKYX 2-38 199-2100 3.4 Control (D02 _0 1 ) PCB det ect ion of f DL Y It is not c urrentl y used. (D02 _02) PCB lo cate SE T Common : When sel ect ed, the PCB p ositioning is set commonly t o the ma chines in the line. I…

EUKYX
2-37199-2100
3.4 Control
(D02) PCB locate Data
When the [PCB locate] tab is pressed in the "Control" window, the following tab sheet appears.
Graphic
Development
F2B37
F2B38

EUKYX
2-38199-2100
3.4 Control
(D02_01)
PCB detection off DLY
It is not currently used.
(D02_02)
PCB locate SET
Common : When selected, the PCB positioning is set commonly to the machines in the line.
Individual : When selected, the PCB positioning is set individually for each machine in the
line.
(D02_03)
PCB locate Sequence
The PCB positioning mode is set in this text box.
Standard : The positioning is performed with both backup base and Z clamp.
Change Z clamp timing : The positioning with Z clamp is performed
after completing the positioning with the backup base.
Vacuum support + Z clamp: The positioning is performed with the vacuum jig and Z clamp.
Only vacuum support : The positioning is performed with the vacuum jig only.
(D02_04)
UP
Positioning 1, Positioning 2
MOVE
The PCB moving up operation for positioning is selected from "Standard" or "Value Set".
Normally, "Standard" is selected.
Standard : When selected, the PCB is moved up for positioning based on the standard value
set in the machine.
Low Speed 1 : When selected, the operation speed is one step lower than the standard value.
Low Speed 2 : When selected, the operation speed is two step lower than the standard value.
Low Speed 3 : When selected, the operation speed is three step lower than the standard value.
Low Speed 4 : When selected, the operation speed is four step lower than the standard value.
Value Set : When selected, the speed value can be set freely.
1st speed DCLR SET
The backup base operation speed reduction rate is set in this text box.
This value is reflected on the first operation in the 2-stage operation in the PCB positioning, and
second operation in the 2-stage operation in the PCB releasing.
2nd speed DCLR SET
The backup base operation speed reduction rate is set in this text box.
This value is reflected on the second operation in the 2-stage operation in the PCB positioning, and
first operation in the 2-stage operation in the PCB releasing.
Z Clamp
Opr. waiting time: The Z-clamp operation WAIT time is set in this text box.
Opr. ST DLY timer: The time period from the backup base moving up start to Z-clamp moving up
start, is set in this text box
.

EUKYX
2-39199-2100
3.4 Control
(D02_05)
DN
Positioning 1, Positioning 2
MOVE
The PCB moving down operation for positioning is selected from "Standard" or "Value Set".
Normally, "Standard" is selected.
Standard : When selected, the PCB is moved up for positioning based on the standard value
set in the machine.
Low Speed 1 : When selected, the operation speed is one step lower than the standard value.
Low Speed 2 : When selected, the operation speed is two step lower than the standard value.
Low Speed 3 : When selected, the operation speed is three step lower than the standard value.
Low Speed 4 : When selected, the operation speed is four step lower than the standard value.
Value Set : When selected, the speed value can be set freely.
1st speed DCLR SET
The backup base operation speed reduction rate is set in this text box This value is reflected on the
first operation in the 2-stage operation in the PCB positioning, and second operation in the 2-stage
operation in the PCB releasing.
2nd speed DCLR SET
The backup base operation speed reduction rate is set in this text box.
This value is reflected on the second operation in the 2-stage operation in the PCB positioning, and
first operation in the 2-stage operation in the PCB releasing.
Backup axis DN start DLY
The time period for the Z-clamp releasing operation completion after the component placement
completion, is set in this text box. After this operation is completed, the backup base starts moving
down.
(D02_06)
SW POSN of 1st / 2nd
The change position between the “First Speed” and “Second Speed” is set in this data box.
(D02_07)
Replace vacuum sensor
The sensor to be used for vacuum pick-up is selected in this data box.
This function is used when the vacuum judgment threshold value is to be changed.
Sensor #1 : When selected, the vacuum pick-up is performed using the sensor #1.
Sensor #2 : When selected, the vacuum pick-up is performed using the sensor #2.
(D02_08)
PCB position of contact
The offset from the transfer position (moving up first stage/moving down first stage target position)
is setup. The value for carrier thickness, etc., is input as upper direction value (plus value).