X3_X4_Series machine.pdf - 第86页
2 Operational safety User manual SIPLACE X-Series 2.10 Lock out and tag out procedur e Software Version SR .601.xx 11/2005 US Edition 86 2.9.2 Placeme nt syst em switc hed off at the main power swit ch and disconnected .…

User manual SIPLACE X-Series 2 Operational safety
Software Version SR.601.xx 11/2005 US Edition 2.9 Energy state of the machine after switching off at the main power switch
85
The following table specifies the voltages of modules when the automatic placement system is
switched off at the main switch, but still connected to the mains supply.
2
Module Voltage
Terminal panel X100
Line filter Z1
Terminals L1, L2, L3
3 x 208 VAC
3 x 230 VAC
3 x 380 VAC
3 x 400 VAC
3 x 415 VAC
Service socket X102
120 VAC
130 VAC
220 VAC
230 VAC
240 VAC
F1 automatic circuit breaker
120 VAC
130 VAC
220 VAC
230 VAC
240 VAC
Main switch Q1
Terminals L1, L2, L3
3 x 208 VAC
3 x 230 VAC
3 x 380 VAC
3 x 400 VAC
3 x 415 VAC
Main switch Q1
Terminals T1, T2, T3
0 VAC
Power supply unit
(see item 5 in Fig. 2.7 - 2
)
Test socket X11
GND X12
Test socket X13_1
Test socket X13_4
GND X13_7
< 10 VDC
< 10 VDC
< 10 VDC
Computer unit (see Fig. 2.9 - 3
)
Test socket + 12 VDC
Test socket - 12 VDC
Test socket + 15 VDC
Test socket -15 VDC
Test socket + 5 VDC
Test socket + 52 VDC
Test socket + 3.3 VDC
GND
0 VDC
0 VDC
0 VDC
0 VDC
0 VDC
0 VDC
0 VDC

2 Operational safety User manual SIPLACE X-Series
2.10 Lock out and tag out procedure Software Version SR.601.xx 11/2005 US Edition
86
2.9.2 Placement system switched off at the main power switch and
disconnected ...
The automatic placement system is unpowered, apart from slight residual voltages in the power
supply unit.
2.9.3 Compressed air conditions in the machine after switching off at the main
power switch
When the system is switched off at the main power switch (item 1 in Fig. 2.9 - 1) or if the power
supply fails, the electrically-controlled main valve Y1 of the compressed air unit closes (item 1 in
Fig. 2.8 - 1
). The pressure will drop to 0 MPa (0 bar) within 5 seconds.
2.10 Lock out and tag out procedure
2.10.1 Purpose and scope
Before performing any preventive maintenance work or service work, a procedure of locking and
tagging must be followed. The procedure, when followed correctly eliminates the possibility of an
employee being injured.
PLEASE NOTE These procedures represent the minimum lock/tag out requirements. Any addi-
tional safeguards needed to complete work safely can be specified by facilities supervision, the
safety officer, the safety committee and the health department. 2
2.10.2 Description
Whenever it becomes necessary to isolate, control and release energy, the following procedure is
to be followed
Æ Notify affected employees.
Æ Shut down the equipment. Carry out all normal stopping procedures:
– Press the Stop button.
– Shut down the station computer.
– Switch the placement machine off at the main power switch.

User manual SIPLACE X-Series 2 Operational safety
Software Version SR.601.xx 11/2005 US Edition 2.10 Lock out and tag out procedure
87
Æ Isolate the machine from all its energy sources:
– Shut off the compressed air supply
– Shut off the main power supply
Æ Lock out the machine.
– Attach a lock whenever possible, e.g. to the motor contactor.
2
Fig. 2.10 - 1 Position of the motor contactor
2
(1) Power supply
(2) Motor contactor
(T) Direction of PCB transport