1OM-1050-002.pdf - 第103页

0102-002 3 - B AFO01EOPP

100%1 / 145
Section 3
Scope of Automatic Operation
0307-003 3-A AFO01EOPP
This section outlines the items to be prepared and con-
firmed before automatic operation and how to start or end
the operation.
0102-002 3 - B AFO01EOPP
1. Normal Automatic Operation
Flow of Automatic Operation
Program Change Operation
Refer to "Volume 2: Operation (Supervisor)" for
details.
Inspections before Automatic Operation
Refer to the following for details.
1.1.1 Confirmation of Power Supply and Air
Pressure
1.1.2 Confirmation of Front Safety Door and
Feeder Carriage Sections
Preparation before Automatic Operation
Refer to the following for details.
1.2.1 Power ON Operation
1.2.2 "AUTO OPN." Window and Zeroing of
Each Device
1.2.3 Preparation for Components and P.C.B.’s
Start of Automatic Operation
Refer to the following for details.
1.3 Start of Automatic Operation
Temporary Stop and Restart of Automatic Operation
Refer to the following for details.
1.4.1 Replenishment of Components and P.C.B.’s
1.4.2 Temporary Stop with [STOP] or [ON]
(entitled "STOP") Button
1.4.3 Stop Operation by Selection of "Auto Stop
Mode"
Interruption of Automatic Operation
Refer to the following for details.
1.5.1 Interruption of Automatic Operation with
[CANCEL] Button
1.5.2 Interruption with [EMERGENCY STOP] Switch
End of Automatic Operation
Refer to the following for details.
1.6.1 Stop of Automatic Operation
1.7.1 Shut-Down Procedure
1.7.2 Locking the Power Breaker with the Padlock
1. Normal Automatic Operation
Fig. 1C1
Fig. 1C2
0301-005 3 - 1 AFO01EOPP