1OM-1050-002.pdf - 第7页

0307-005 6 AFO01EOPP Contents Page 1.2 Preparation before Automatic Operation ................................ 3- 5 1.2.1 Power ON Operation ............................................................... 3- 5 1.2.2 &quo…

100%1 / 145
0307-005 5 AFO01EOPP
Contents
Page
2.3 Operational Measures .................................................................. 1-10
2.3.1 Power Breaker ........................................................................... 1-10
2.3.2 Light Tower ................................................................................. 1-11
2.3.3 Front Operation Panel ............................................................. 1-12
2.3.4 Rear Operation Panel .............................................................. 1-18
2.3.5 Front Service Panel ................................................................. 1-20
2.3.6 Rear Service Panel .................................................................. 1-21-1
2.3.7 Ethernet LAN .............................................................................. 1-21-2
2.4 Main Units ........................................................................................ 1-22
2.4.1 Feeder Carriages ...................................................................... 1-22
2.4.2 L and R Conveyor Sections ................................................... 1-23
2.4.3 P.C.B. Transfer Section ........................................................... 1-24
2.4.4 X/Y Table Section ..................................................................... 1-25
2.4.5 Placement Head Section ........................................................ 1-26
2.4.6 Component Recognition Section ......................................... 1-27
2.4.7 P.E.C. Recognition Section .................................................... 1-28
3. Surface Mounting Mechanism ........................................................ 1-29
3.1 P.C.B. Transfer and Positioning ................................................. 1-29
3.2 Component Picks and Placement .............................................. 1-30
3.3 P.C.B. Transfer (to the output machine) .................................. 1-31
Section 2 Basic Knowledge of Operations
................ 2- A
1. Basic Operations ................................................................................ 2- 1
1.1 Selection of Front or Rear Operation Panel .......................... 2- 1
1.2 Touch Screens ................................................................................ 2- 2
1.2.1 Operation Windows .................................................................. 2- 2
1.2.2 Notes on Handling Touch Screens ...................................... 2- 3
2. Starting or Exiting from the Application ....................................... 2- 4
2.1 Getting Started ............................................................................... 2- 4
2.2 Structure of Operation Windows ............................................... 2- 6
2.3 Exiting from Operation Window ................................................. 2- 8
Section 3 Scope of Automatic Operation
.................... 3- A
1. Normal Automatic Operation ........................................................... 3- 1
1.1 Inspections before Automatic Operation ................................ 3- 2
1.1.1 Confirmation of Power Supply and Air Pressure ............. 3- 2
1.1.2 Confirmation of Front Safety Door and
Feeder Carriage Sections .................................................. 3- 4
0307-005 6 AFO01EOPP
Contents
Page
1.2 Preparation before Automatic Operation ................................ 3- 5
1.2.1 Power ON Operation ............................................................... 3- 5
1.2.2 "AUTO OPN." Window and Zeroing of Each Device ....... 3- 7
1.2.3 Preparation for Components and P.C.B.’s ......................... 3- 9
1.3 Start of Automatic Operation ...................................................... 3-11
1.4 Temporary Stop and Restart of Automatic Operation .......... 3-13
1.4.1 Replenishment of Components and P.C.B.’s .................... 3-13
1.4.2 Temporary Stop with [STOP]
or [ON] (entitled "STOP") Button .................................... 3-16
1.4.3 Stop Operation by Selection of
"Auto Stop Mode" ................................................................. 3-16-1
1.5 Interruption of Automatic Operation ......................................... 3-17
1.5.1 Interruption of Automatic Operation
with [CANCEL] Button ......................................................... 3-17
1.5.2 Interruption with [EMERGENCY STOP] Switch ............... 3-17-1
1.6 End of Automatic Operation ........................................................ 3-18
1.6.1 Stop of Automatic Operation ................................................. 3-18
1.7 Shut-Down Operation ................................................................... 3-19
1.7.1 Shut-Down Procedure ............................................................. 3-19
1.7.2 Locking the Power Breaker with the Padlock .................. 3-22
2. "PASS" Mode ....................................................................................... 3-23
2.1 Start of "PASS" Operation ........................................................... 3-23
2.2 Temporary Stop of Pass Operation ........................................... 3-26
2.2.1 Temporary Stop (Pause) with [STOP] Button ................... 3-26
2.3 Interruption of Pass Operation .................................................. 3-26
2.3.1 Interruption with [CANCEL] Button ..................................... 3-26
2.3.2 Interruption with [EMERGENCY STOP] Switch ............... 3-26
2.4 End of "PASS" Operation ............................................................. 3-27
2.4.1 Stop of "PASS" Operation ...................................................... 3-27
2.4.2 Shut-Down Operation .............................................................. 3-27
Section 4 Remedy of Simple Trouble
............................. 4- A
1. Power Operation Impossible........................................................... 4- 1
2. Nothing Displayed on Touch Screen ............................................ 4- 2
3. Remedial Procedure from "ERROR" Window ............................ 4- 3
3.1 [EMERGENCY STOP] Switch Pressed .................................... 4- 3
3.1.1 During Automatic Operation .................................................. 4- 3
3.1.2 During Pass Operation ............................................................ 4- 5-1
3.2 Continuous Operation Disabled during
Component Placement ................................................... 4- 6
Checking Items
1. Transfer and/or Resale of Machine
If the machine is scheduled to be transferred to another place and/or
resold to a third party, please contact our marketing department or sales
agency beforehand.
Any relocation and/or resale of the machine without prior written notice
or advice, we will in no way be liable for any trouble or malfunctions of
the machine regardless of the possibility of any trouble or malfunctions
arising from the displacement.
Before setting up a resold and/or transferred machine, please ask our
service personnel or sales agency for safety inspections.
Examples of Errors or Malfunctions after Machine Transfer
(1) The machine may malfunction, depending on the local power
source (difference in power frequency or voltage).
(2) When the machine is transferred to another place, it may mal-
function due to environmental condition such as electric wave
interference or noise.
These instruction manuals should be regarded as part of the machine.
The contents of these manuals comply with the specifications of the
machine. Whenever the machine is scheduled to be resold to a third
party, be sure to sell the machine together with these manuals.
2. Request on Machine Disposal
This machine (TCM-X series) uses a strong permanent magnet in the moving
mechanism of the feeder carriage section (F axis).
Before disposing of the machine, please contact our marketing department or
sales agency for the proper disposal.
0301-003 7
AFO01EOPP