1OM-1050-002.pdf - 第22页
2.5 Precautionary Items during Maintenance 2 .5 Precautionary Items during Maintenance • Only qualified personnel should perform maintenance work carefully in compliance with the specified procedures. 0207-004 2 1 AFO01E…

• When a component pick-up error has occurred and the machine has
stopped, be sure to remove the mispicked component from the tape
feeder and then start the automatic operation.
0102-002 20
AFO01EOPP
Fig. 1X23
2.4 Precautionary Items during Operation
CAUTION

2.5 Precautionary Items during Maintenance
2.5 Precautionary Items during Maintenance
• Only qualified personnel should perform maintenance work carefully in
compliance with the specified procedures.
0207-004 21
AFO01EOPP
WARNING
Air Source Section
• Before maintenance work, be sure to lock the power breaker
and the main valve section (air source) with padlocks.
Power Breaker: Set the power breaker to the "OFF" side and lock
it with a padlock.
Air Source: Set the main valve to the "EXH." side and lock it
with a padlock.
• Designate a person who can have charge of the padlock key.
• If the provided padlock is lost or damaged, purchase its sub-
stitute.
Power Supply Section
Fig. 1X24
Fig. 1X25
WARNING

2.6 Pre-Installation Checks
2.6 Pre-Installation Checks
If the machine is installed in unsatisfactory environmental conditions, it
may malfunction due to damage or breakdown.
To avoid this, make preparations to install the machine as follows.
• The primary power supply must be prepared on the local site.
Voltage : 200±20 V AC, 3-Phase
Apparent Power : TCM-X100: Approx. 16 kVA
TCM-X200: Approx. 16 kVA
TCM-X300: Approx. 16 kVA
• Our service personnel will connect the primary power source.
When any person other than our service personnel must connect the
primary power source, consult our marketing department or sales
agency beforehand.
• If the machine is scheduled to be transferred to another place, please
contact our marketing department or sales agency beforehand.
• Select a place solid enough to support the mass of the machine.
Ref. : It is recommended that the machine should be installed on the first floor.
When the machine has to be installed on a floor other than the first one, please
contact our marketing department or sales agency for details.
Fig. 1X26
• Avoid any place that vibrates severely.
Fig. 1X27
0301-004 22
AFO01EOPP