X7056_Operating manual_en.pdf - 第239页

Packing 239 Inspection system X7056 | Operating manual | Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a Packing This chapter describes how to pack the inspection system, step by step. It contains the fol lowing sections:…

100%1 / 280
Decommissioning
Take the inspection system out of operation
238
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Packing 239
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Packing
This chapter describes how to pack the inspection system, step by
step.
It contains the following sections:
Safety (Page 240)
Packing the inspection system (Page 241)
Storage (Page 249)
Disposal (Page 250)
Packing
Safety
240
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006| 2016-01-06 | 30.009.1930a
Safety
Follow these instructions when packing the system:
For packing, use a sufficiently large surface that is protected
from moisture.
Only use original Viscom accessory parts (transportation safety
devices and screws) to secure the positioning unit.
Only use original Viscom accessory parts (transport clamps and
screws) to secure the inspection system to the wooden pallet.
To load the system, follow the specifications in the transport
manual.
For all work on and with the system and during disposal,
observe all local legally mandated guidelines for waste preven-
tion and appropriate recycling and disposal.