X7056_Operating manual_en.pdf - 第277页
Index 277 Inspection system X7056 | Operating manual | Version 3.1 Rev.006 | 2016-01-06 | 30.009.1930a checking 105 Network transformer 37 O Operating conditions 69, 253 Operating elements key switch 34 light switch 34 m…

Index276
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006 | 2016-01-06 | 30.009.1930a
checking safety features 92
Switching on inspection
system 91
Flat panel detector
bracket 42
positioning unit 43
Flat panel detector (FPD) 42
Foot reinforcements 60
Front view 29
G
General view 29
H
Hardware
troubleshooting 164
I
Impact indicator 59
Industrial truck 57
Inspection operation
continuing 157
ending 157
interrupting 157
Starting 156
Inspection plan
choosing 156
Inspection speed
system weight 263
Inspection system
cleaning 237
description 26
fastening 243
general view 29
operation 155
options 27
packing 241
Setting 69
switching off 159
Switching on 154
transporting 248
unpacking 61
use 28
wrapping 245
Installation 67
electrical 78
first use 91
integrating system into line
82
mechanical 69
safety 68
Interfaces 47
Interlock
checking 100
Interlock linkage 49
K
Key switch 34
L
Lifespan 46
Lift gate 39
checking 94
Light switch 34
Line integration 82
adjusting height 84
aöigning 85
checking transport track
width 87
setting width 86
Lubrication 190, 196
lift gate 198
runner block. 177, 181
spindles and guides 186,
188
M
Main switch 34
Maintenace
exchanging filter mats 223,
225
Maintenance 169
maintenance schedule 171
safety 170
Sealed X-ray tube 220
Maintenance schedule 171
Malfunctions 161
Customer Support 167
safety 162
troubleshooting 163
Mechanical installation 69
attaching signal lamp 75
communication with adja-
cent devices 87
horizontal alignment 76
Monitoring the warning lamp
signals 46
Motor overload switch 53
Motor overload switch (Q1EA)
setting 81
N
Network connections

Index 277
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006 | 2016-01-06 | 30.009.1930a
checking 105
Network transformer 37
O
Operating conditions 69, 253
Operating elements
key switch 34
light switch 34
main switch 34
Operating manual
representation conventions
13
required reading 11
target groups 11
Operation 147
choosing inspection plan 156
continuing inspection opera-
tion 157
ending inspection operation
157
inspection system operation
155
interrupting inspection
operation 157
release PCB clamping 151
safety 148
safety features 149
Starting the inspection
operation 156
switching off the inspection
system 159
switching on the inspection
system 154
Operation elements 34
mouse 34
ON button 34
Operator 12
Options 27
SPC server 27
verification station 27
P
Packing 239
fastening inspection system
243
packing in transport case
248
preparing the wooden pallet
241
safety 240
securing lift door 242
setting system feet 242
transporting inspection
system 248
wrapping inspection system
245
PCB clamping
release 151
PCB stopper 39
PCB transport
checking 104
troubleshooting 165
Pivoting frame
opening 87
Positioning unit
AOI 39
AXI 39
Power supply 47
Product description 25
Protective barrier safety
features 153
Protective features 53
Protocol
SMEMA 48
protocol
SV70 48
R
Rear view 31
Remaining Dangers
chemical hazard 23
Remaining dangers 22
electrical 22
magnetism 23
mechanical 22
radiation 23
thermal 22
Replacement part lists
3-D option 274
ceramic option 271
sealed X-ray tube 267
Replacement parts list
flat panel detector 272
XM 270
Representation conventions 13
Required reading 11
S
Safety 19, 20
Remaining dangers 22
Safety circuits 52
Safety conductor connection
checking 80
secondary 80

Index278
Inspection system X7056 | Operating manual |
Version 3.1 Rev.006 | 2016-01-06 | 30.009.1930a
Safety contact switch 52
Safety equipment
150
Safety Features 51
operation 149
Safety features
automatic cutout 54
checking 92
EMERGENCY STOP 51
key switch 53
motor overload switch 53
protective barrier 53
protective barrier safety
features 153
protective features 53
STOP mode 51, 149
X-ray system 52
Sealed X-ray tube 44
Battery 46
exchanging the battery 220
Maintenance 220
Maintenance procedure 220
Monitoring the warning lamp
signals 46
overview 44
reconditioning 222
shutter 46
X-ray window 46
Sealed x-ray tube
Lifespan 46
Setting 69
Setting conditions 69
Setup personnel 12
Shutter
checking 97
sealed x-ray tube 46
Signal lamp 35
SMEMA 47
checking 101
SMEMA and SV70 interface
protocol 47
SMEMA-Protocol 48
Software 109
automatic mode 114
Ending 158
ending 145
inspection plan change
Inspection plan
changing 141
Logon window 110
starting 155
troubleshooting 164
Viscom Vision Pilot 110
Space requirements 70
SPC server 27
Standard connection 78
STOP mode 51, 149
actuating 149
checking 93
ending 150
Storage 249
Storage conditions 253
Structure of the Operating
Manual 10
SV70 47
checking 103
SV70-protocol 48
System components 37
flat panel detector (FPD) 42
lift gate 39
network transformer 37
transport system 38
UPS 37
XM 3-D camera technology
41
XM sensor head 41
System computer 47
System dimensions 258
System specifications 252
System weight 263
T
Table of malfunctions 163
Target groups 11
Technical specifications 251
center of gravity 260
communication interfaces
252
electrical specifications 252
flat panel detector 256
noise emission 252
PCB handling 257
PCB size 257
sealed X-ray tube 255
system computer 252
system dimensions 258
system specifications 252
tipping angle 261
transport system 257
transport tracks 257
XM camera technology 254
Tilt indicator 59
Tipping angle 261
Training. 15