1OM-1075-002.pdf - 第102页

AHB01EOPP 1. 2 Preparation before Operation 1.2.1 Power ON Operation (1) Reconfirm that the safety doors and the feeder base pullout preven- tion bars are closed. (2) Remove the padlock from the lock lever of the power b…

100%1 / 145
AHB01EOPP
1.1.2 Confirmation of Safety Doors and Feeder Base Pullout
Prevention Bars
(1) Confirm that the front and rear safety doors are closed.
(2) Confirm that all feeder base pullout prevention bars are closed.
Fig. 1C4 Safety Doors
1.1 Inspections before Automatic Operation
0206-003 3 - 4
AHB01EOPP
1.2 Preparation before Operation
1.2.1 Power ON Operation
(1) Reconfirm that the safety doors and the feeder base pullout preven-
tion bars are closed.
(2) Remove the padlock from the lock lever of the power breaker.
Fig. 1C5
0308-004 3-5
1.2 Preparation before Operation
AHB01EOPP
(3) Set the power breaker to "ON".
Power is supplied to the machine.
To re-power the machine, shut down the main breaker
and wait for about 10 seconds. After that, turn on the
main breaker.
If the main breaker is turned on immediately after it
was shut down, the previous data (the data retained
before the current is intercepted) will not be reset, lead-
ing to a rare malfunction in the breaker.
Fig. 1C6
1.2 Preparation before Operation
CAUTION
0308-001 3-5-1