1OM-1075-002.pdf - 第97页

AHB01EOPP 0107-001 3 - B

100%1 / 145
AHB01EOPP
Section 3
Scope of Automatic Operation
0308-002 3-A
This section outlines the items to be prepared and confirmed
before automatic operation and how to start or end the opera-
tion.
AHB01EOPP
0107-001 3 - B
AHB01EOPP
1. Normal Automatic Operation
Flow of Automatic Operation
Program Change Operation
Refer to "Vol. 2: Operation (Supervisor)" for details.
Inspections Work before Operation
Refer to the following for details.
1.1.1 Confirmation of Power Supply and Air Pressure
1.1.2 Confirmation of Safety Doors and Feeder Base
Pullout Prevention Bars
Preparation before Operation
Refer to the following for details.
1.2.1 Power ON Operation
1.2.2 "AUTO OPN." Windows and
Zeroing of Each Device
1.2.3 Preparation for Components and P.C.B.’s
Start of Automatic Operation
Refer to the following for details.
1.3 Start of Automatic Operation
Temporary Stop and Restart of Automatic Operation
Refer to the following for details.
1.4.1 Replenishment of Components
1.4.2 Replenishment of P.C.B.’s
1.4.3 [STOP] and [ON] (entitled "STOP") Buttons
1.4.4 Stop Operation by Selection of "Auto Stop
Mode"
Interruption of Automatic Operation
Refer to the following for details.
1.5.1 Interruption with [CANCEL] Button
1.5.2 Interruption with [EMERGENCY STOP] Button
End of Automatic Operation
Refer to the following for details.
1.6.1 Stop of Automatic Operation
1.7.1 Procedure for Shut-Down Operation
1.7.2 Locking the Power Breaker with the Padlock
1. Normal Automatic Operation
Fig. 1C1
Fig. 1C2
0206-003 3 - 1