AHB01EOPP 1 . 1 Inspections before Automatic Operation 1.1.1 Confirmation of Power Supply and Air Pressure (1) Confirmation of Power Supply Confirm that the local main breaker (the power supply to the ma- chine) is "…

AHB01EOPP
1. Normal Automatic Operation
Flow of Automatic Operation
Program Change Operation
Refer to "Vol. 2: Operation (Supervisor)" for details.
Inspections Work before Operation
Refer to the following for details.
1.1.1 Confirmation of Power Supply and Air Pressure
1.1.2 Confirmation of Safety Doors and Feeder Base
Pullout Prevention Bars
Preparation before Operation
Refer to the following for details.
1.2.1 Power ON Operation
1.2.2 "AUTO OPN." Windows and
Zeroing of Each Device
1.2.3 Preparation for Components and P.C.B.’s
Start of Automatic Operation
Refer to the following for details.
1.3 Start of Automatic Operation
Temporary Stop and Restart of Automatic Operation
Refer to the following for details.
1.4.1 Replenishment of Components
1.4.2 Replenishment of P.C.B.’s
1.4.3 [STOP] and [ON] (entitled "STOP") Buttons
1.4.4 Stop Operation by Selection of "Auto Stop
Mode"
Interruption of Automatic Operation
Refer to the following for details.
1.5.1 Interruption with [CANCEL] Button
1.5.2 Interruption with [EMERGENCY STOP] Button
End of Automatic Operation
Refer to the following for details.
1.6.1 Stop of Automatic Operation
1.7.1 Procedure for Shut-Down Operation
1.7.2 Locking the Power Breaker with the Padlock
1. Normal Automatic Operation
Fig. 1C1
Fig. 1C2
0206-003 3 - 1

AHB01EOPP
1.1 Inspections before Automatic Operation
1.1.1 Confirmation of Power Supply and Air Pressure
(1) Confirmation of Power Supply
Confirm that the local main breaker (the power supply to the ma-
chine) is "ON".
• Power Supply : 200 V AC, 3-Phase
• Apparent Power : Approx. 5 kVA for TIM-X100
(2) Confirmation of Air Pressure
Confirm that the air pressure is set to the value specified below.
• Main Pressure : 0.4 MPa (4.1 kgf/cm
2
)
• Air Blowing Pressure : 0.05 MPa (0.5 kgf/cm
2
)
• Z Clamping : Set Pressure 0.2 to 0.4 MPa
(2.0 to 4.1 kgf/cm
2
)
[Standard Value 0.2 MPa
(2.0 kgf/cm
2
)]
• Alignment in Y Direction : Set Pressure 0.3 to 0.4 MPa
(3.1 to 4.1 kgf/cm
2
)
[Standard Value 0.3 MPa
(3.1 kgf/cm
2
)]
"Alignment in Y Direction" means that the P.C.B. is pushed
in the Y direction by the Y pusher.
"Z Clamping" means that the P.C.B. is brought upward by
the clamp.
Fig. 1C3
1.1 Inspections before Automatic Operation
0308-005 3-2
Note
Main Pressure
0.4 MPa (4.1 kgf/cm )
2

AHB01EOPP
Fig. 1C3-1
Do not change the set air pressure. Otherwise, the
pneumatic devices will not work normally.
(a) The pressure switch is correctly set. Be sure not to adjust it.
(Reference) 0.35 MPa (3.6 kgf/cm
2
)
(b) Never adjust the air blowing pressure. The pressure is al-
ready set to "0.05 MPa (0.5 kgf/cm
2
).
(c) Dry and Clean Air
Be sure to use dry and clean air. If moisture, oil, dust, etc.,
enter a pneumatic device (air cylinder, etc., used in this
machine), it will result in a breakdown of the machine.
Dry and Clean Air:
Moisture : Dew Point -17°C or lower (Atmospheric Pres-
sure)
Oil : 0.1 mg/m
3
or less (ANR)
Dust : Solid Material 0.01 µm or less
1.1 Inspections before Automatic Operation
0308-004 3-3
Note
CAUTION