1OM-1075-002.pdf - 第108页

AHB01EOPP Operation Procedure 1. Confirm that the machine is set in the "STOP" mode. 2. Confirm that the front and rear safety doors are closed. Confirm that the lamp of the [READY] button illuminates in green.…

100%1 / 145
AHB01EOPP
(3) Press the [Origin/Signal Info.] tab to open the [Origin/Signal Info.]
tab sheet and perform the zeroing operations.
Fig. 1C11 "Origin/Signal Info." Tab Sheet (Provided with Multi-Layer Tray Feeder #2)
(a) The tab sheet may look different, depending on which op-
tions are selected.
(b) When "z" marks are not displayed for all devices other than
"Conv. Wid. Adj. Axis" in the "Origin Information" group box
of the "Origin/Signal Info." tab sheet, the automatic opera-
tion of the machine cannot be started.
Fig. 1C12 Origin Information (Provided with Multi-Layer Tray Feeder #2)
When "z" mark is not displayed for a device (s) other than "Conv. Wid.
Adj. Axis", follow the operation procedure below to perform a zeroing
operation for the device (s).
1.2 Preparation before Operation
0308-003 3-8-1
Note
AHB01EOPP
Operation Procedure
1. Confirm that the machine is set in the "STOP" mode.
2. Confirm that the front and rear safety doors are closed.
Confirm that the lamp of the [READY] button illuminates in green.
Otherwise, press the [READY] button and wait until the lamp illumi-
nates.
3. When the [ENABLE] button on the operation panel is pressed in 2
seconds after the [ALL] button (entitled "ZERO"), all devices except
"Conv. Wid. Adj. Axis" (one of the devices displayed in the "Origin
Information" group box of the "Origin/Signal Info." tab sheet) are ze-
roed.
Zeroing: The lamp of the [START] button illuminates.
Zeroing Completed: The lamp of the [START] button flick-
ers.
1.2 Preparation before Operation
0206-003 3 - 9
Note
AHB01EOPP
1.2.3 Preparation for Components and P.C.B.’s
Preparation for Components
The following is explained, presuming that the tape feeders are
being used.
As for the preparation for the vibratory stick feeders and the
multi-layer tray feeders (option), refer to each instruction manual
for details.
(1) Press the [STOP] button.
(2) Detach the feeder base pullout prevention bar.
(3) Check which type of the tape feeder (grip color and type) should be
installed in which slot No. (Fdr. No.). After that, install the tape feed-
ers correctly.
Fig. 1C13
Refer to "Attachment and Detachment of Tape Feeders to Feeder
Base" in the instruction manual of tape feeders for details.
(4) Attach the feeder base pullout prevention bar.
The feeders should be seated securely. Otherwise,
a collision with the head section or a pick-up error
will occur.
Be sure to install the feeders on the correct feeder
slot Nos. (Fdr. No.). Otherwise, some components
may be trapped between the heads.
1.2 Preparation before Operation
0308-004 3-10
Fdr. No. Plate
Grip
Note
Note
CAUTION