1OM-1075-002.pdf - 第13页

2 . 2 Precautionary Items before Operation 2.2 Precautionary Items before Operation • Remove the selection key of the [OPERA TION] switch before operating the machine automatically . The selection key must be used to set…

100%1 / 145
0308-003 11 AHB01EOPP
Only a well-trained personnel should operate the machine.
In case of earthquake, windstorm, fire, or lightning, stop the machine im-
mediately, turn off power switches and cut the power supply to the ma-
chine.
2.1 Basic Precautions
Do not use the floppy disk drive in the control box. Otherwise, the ma-
chine may break down because the program in the hard disk of the ma-
chine may be changed due to computer viruses or worms.
Fig. 1X9-1 Floppy Disk Drive in Control Box
WARNING
CAUTION
CAUTION
2.2 Precautionary Items before Operation
2.2 Precautionary Items before Operation
Remove the selection key of the [OPERATION] switch before
operating the machine automatically.
The selection key must be used to set the [OPERATION] switch to the
"SETUP" mode and kept by the person in charge. In other cases, the key
should not be kept inserted.
Do not set the [OPERATION] switch to the "SETUP" side un-
less any setup operations are performed.
When the [OPERATION] switch is set to the "SETUP" side, setup opera-
tions become possible with the front safety door being open. It is very
dangerous to operate the machine without safety check. Be sure to pay
a special caution while operating the machine.
Fig. 1X10
Make certain that no one (or only part of body and clothes) or foreign
objects remain within the moving parts of the machine. Check safety
and power up the machine to start operating the machine.
Do not start the machine unless those working in the immedi-
ate area of the machine are aware of hazards from moving parts.
0308-003 1 2 AHB01EOPP
RUN SETUP
Front Operation Panel
OPERATION
[OPERATION] Switch
Selection Key
WARNING
WARNING
2.2 Precautionary Items before Operation
Only qualified personnel should come within the operating area of the
machine.
Inspect the devices before starting the automatic operation.
In principle, the buttons on the operation panel and the keys
on the touch screen must be operated by only one person.
If there are more than one, ensure good communication by giving loud
verbal instructions.
Do not use any unspecified tape and vibratory stick feeders.
0308-004 1 3
AHB01EOPP
After the machine has been stopped for a long period of time, follow the
steps below to smoothly start up the machine.
Secure stable environmental condition (room temperature, etc.) for the
machine.
Perform a running-in operation for approx. 30 minutes.
Refer to "8. Running-In Operation" in "Section 5" of "Vol. 2: Operation
(Supervisor)" for the detailed information on the running-in operation.
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
Fig. 1X11