FlexTRAK 2MB Material Handler Addendum Rev 05.pdf - 第141页
FlexTRAK Series 2MB Mater ial Handler Adden dum Maintenance © 2023 Nordson Corporation 8-13 To replace the co nveyor belts: CAUTION! This procedure sh ould only be performed by a trained service technician. 1. Perform a …

FlexTRAK Series 2MB Material Handler Addendum Maintenance
8-12 © 2023 Nordson Corporation
8.4.4 Replacing the Conveyor Belts
Checking the condition of the conveyor belts should be part of the routine maintenance schedule for the
conveyor system. Replace cracked, worn, or broken belts immediately.
To maintain reliable system performance, it is recommended that the conveyor belts be changed every six
months. However, the belts may need to be changed more or less frequently, depending upon system use.
Tools and Materials Needed:
q
4 mm Hex Key
q
Soft Cloth and Cotton Swabs
q
2.5 mm Hex Key
q
Replacement Conveyor Belts
q
Isopropyl Alcohol
q
Removable Thread Locker
q
Phillips Screwdriver
q
Torque Wrench
?
NOTE See Appendix A for a list of replacement conveyor belts.
Remove only one belt at a time. Use the other belt as a reference for proper orientation of
the belt being replaced.
For ease of reinstallation, note the locations and orientations of rail-mounted components
before removing them.
Retain all components and fasteners removed during this procedure in an orderly manner
and in a safe location for reinstallation or shipment back to Nordson.

FlexTRAK Series 2MB Material Handler Addendum Maintenance
© 2023 Nordson Corporation 8-13
To replace the conveyor belts:
CAUTION! This procedure should only be performed by a trained service
technician.
1. Perform a service shutdown, see 2.11 Service Shutdown.
2. Open the front door.
3. Push the gripper assemblies toward the chamber, providing access to the conveyor.
4. Loosen the belt tensioner screw located on the tension pulley tire (Figure 8-4).
5. Slide the tension pulley tire to the right to reduce tension and provide slack in the belt.
6. Remove the old belt from all pulley tires and discard.
7. Using isopropyl alcohol and a soft cloth or cotton swabs, clean all metal surfaces that make
contact with the belt, including pulleys and rails.
8. Compare the new belt to the one remaining on the other rail to determine its proper
orientation.
9. Loop the new belt around the pulley tires at the opposite end from the motor (Figure 8-4).
Continue to loop from one end of the conveyor rail and extend it toward the motor end.
10. Loop the conveyor belt around the two pulley tires on the tensioner.
11. Reposition the tension pulley tire and belt securely in place while tightening the screw with
a 4 mm hex key. Torque the screw to 87 in-lbs (1.0 kg-m).
12. When both conveyor belts have been replaced, power on the system.
13. Open the Maintenance screen and enable manual mode, see 6.7 Manual Mode.
14. Click on the conveyor tab and run both Lane 1 and Lane 2 motors manually to test the
conveyor belts.
„ The conveyor belts should move smoothly with no slipping on their pulleys.

FlexTRAK Series 2MB Material Handler Addendum Maintenance
8-14 © 2023 Nordson Corporation
15. If necessary, tension the conveyor belts, see 8.4.3 Tensioning the Conveyor Belts.
Item Description Item Description
1 Stop Pin 4 Front Conveyor Rail
2 Conveyor Belt 5 Rear Conveyor Rail
3 Pulley Tire Tensioner Screw 6 Pulley Tires
Figure 8-4 Conveyor Belt Removal/Installation
1
2
3
4
5
6