FlexTRAK 2MB Material Handler Addendum Rev 05.pdf - 第32页
FlexTRAK Series 2MB Mater ial Handler Adden dum Safety 2-18 © 2023 Nordson Corporation 2.11 Servi ce S hutdown Before performing any service or parts replacement, th e FlexTRAK-2MB system should be s hutdown as follows: …

FlexTRAK Series 2MB Material Handler Addendum Safety
© 2023 Nordson Corporation 2-17
Figure 2-8 FlexTRAK-2MB Center of Mass (approximate)
800 mm
(31.50 in.)
350 mm
(13.70 in.)
660 mm
(26.00 in.)
800 mm
(31.50 in.)
Center of
Mass

FlexTRAK Series 2MB Material Handler Addendum Safety
2-18 © 2023 Nordson Corporation
2.11 Service Shutdown
Before performing any service or parts replacement, the FlexTRAK-2MB system should be shutdown
as follows:
To shutdown for service:
1. Shutdown the computer.
2. Press the red EMO button (Figure 2-5) to turn OFF the machine.
3. Perform a system lockout, see 2.7.1 System Lockout.
2.11.1 System Lockout
During maintenance and servicing tasks, prevent injury to personnel by locking out and tagging out
system power and gas supplies.
Refer to the FlexTRAK Series Installation, Operations, and Maintenance manual for the lockout/tagout
procedure.
?
NOTE The purpose of any system lockout is to help avoid injury or system damage due to
unexpected energizing of equipment, start up, or the release of stored energy during
repair, maintenance, and operation of equipment. Situations where lockout practices
might not be required are when troubleshooting electrical, pneumatic, or hydraulic
components or assemblies that make de-energizing the whole system impractical.
2.11.2
31B31B
Restoring the System to Service
To restore the system to service:
1. Make sure all doors, panels, and guards are in place.
2. Unlock and remove the padlock on the lockout devices.
3. Remove all warning tags.
4. Reconnect the electrical plug to facility power.
5. To start the system, twist the red EMO/Off button counterclockwise until it pops out and
press the green ON button (Figure 2-5).

© 2023 Nordson Corporation 3-1
3 Installation
3.1 Overview
The FlexTRAK comes fully integrated into the FlexTRAK-2MB system. Upon installation, a Technical
Support technician will verify that the conveyor, transfer system and plasma chamber are leveled and
aligned to each other and will make the necessary adjustments to the system. Each gripper and conveyor
position will be verified to ensure that the machine will be functional after it is installed at the factory
location.
•
Facility Requirements
•
Connecting to the Facility
•
Unpacking and Storing the System
•
Initial Start
-
up Procedure
•
Placing the System
?
NOTE Normally, Technical Support performs the initial installation of all FlexTRAK-2MB
systems. The procedures in this section are provided in the event the system is relocated
after initial installation.
3.2 Safety First
Before performing any of the procedures in this section, see Section 2 - Safety.