Spectrum+Operating+Manual.pdf - 第54页
S2-9 XX X Se ri es Disp ensi n g Syst em IOM Man ual Ins tallation 3-2 © 2023 Nordson Corporatio n 3.5 Uncr atin g and Placing the Dispensing Syst em To uncrate an d place the dispensin g system: 1. C heck the “ Tip &…

© 2023 Nordson Corporation 3-1
3 Installation
3.1 Overview
This section describes installation procedures for the dispensing system and covers the following topics:
• Uncrating and Placing the Dispensing System
• Installing the Laptop Computer
• Unpacking the Dispensing Chamber
• Anchoring the Dispensing System
• Leveling the Dispensing System
• Installing the Dovetail Bracket
• Setting Up the Service Station
• Connecting the Power and Air Supply
• Installing the Light Beacon
• Adjusting the Main Air Pressure
3.2 Safety First
Operation of your dispensing system involves heat, air pressure, electrical power, mechanical devices,
and the use of hazardous materials. Read this manual in its entirety before attempting any system or
component operation. It is essential for all personnel working on or around the dispensing system to fully
understand the hazards, risks, and safety precautions associated with operating the system. When properly
operated and maintained, the dispensing system is safe and reliable. See Section 2 - Safety for additional
information.
WARNING! The procedures in this section should only be performed by a trained
service technician.
3.3 Facility Requirements
To ensure optimal performance and safety, it is necessary to install the dispensing system in a facility that
meets the requirements, see 9.2 Facility Requirements. If you have any questions about facility
requirements, please contact Asymtek Technical Support.
3.4 Tools and Materials Needed
• 3 mm hex key
• 1/2-inch wrench
• 9/16-inch wrench
• Phillips Screwdriver (Item 59)
• Band Cutter
• 1 1/2-inch wrench (Item 59)
• Personal Protective Equipment
• Diagonal-cut pliers
• Hammer
• Forklift
• Flat Bar
• Box Level

S2-9XXX Series Dispensing System IOM Manual Installation
3-2 © 2023 Nordson Corporation
3.5 Uncrating and Placing the Dispensing System
To uncrate and place the dispensing system:
1. Check the “Tip & Tell” and "Shockwatch" devices, both on the outside of the shipping crate
and on the dispensing system, to make sure that the dispensing system has not been dropped
or tipped. If any of these devices has been activated, contact Asymtek.
NOTE If the dispensing system is being installed in a cleanroom, uncrate the system,
remove all packaging material, including wrapping paper and tape from all
parts and components, before moving into the cleanroom.
2. Locate and remove the envelope on the outside of the shipping crate. Open the envelope
and locate the shipping list.
As you unpack each item inside of the box, identify the item, locate it on the shipping
list, and place a checkmark next to the item.
3. Refer to the uncrating instruction sheet and use the flat bar and hammer or a drill to remove
the lid and sides of the crate.
WARNING! Personnel should wear gloves and safety glasses while removing the top and
sides of the crate. Sufficient personnel should be used to lift and control the crate
to prevent serious injury to personnel or damage to the dispensing system.
4. Remove the four (4) machine-to-crate shipping brackets attached to the pallet using a 1/2-
inch wrench and 9/16-inch wrench (Figure 3-1).
5. Remove the two (2) 1/2-inch hex head screws clamping the four shipping brackets to the
levelers.
Item
Description
Item
Description
1
Foot Restraint Bracket
5
Lag Bolts and Washers
2 Hex Head Screws and Washers 6 Hex Nuts and Washers
3
Leveler (foot)
7
Post Nut
4 Machine-to-Crate Shipping Bracket 8 Lock Nut
Figure 3-1 Removing the Shipping Brackets
1
3
4
8
7
6
2
5

S2-9XXX Series Dispensing System IOM Manual Installation
© 2023 Nordson Corporation 3-3
6. When the four shipping brackets have been removed, slide the forklift forks under the front
of the dispensing system between the levelers (feet). Use the forklift to gently lift the
dispensing system off of the crate.
You may use the shipping crate for future shipping purposes or dispose of according
to local regulations.
Save the shipping brackets. They can be used later for seismically securing the
dispensing system, see 3.11 Anchoring the Dispensing System.
CAUTION! Lift the dispensing system from the front only. Attempting to lift the dispensing
system from the back or sides may cause serious damage. Place forks between
the front feet, making sure that the blades reach from front to back.
WARNING! The dispensing system has a high center of gravity causing sensitivity to tipping.
Use extreme caution when lifting and moving the dispensing system.
7. Move the dispensing system over the location where it will be installed.
NOTE Remove all shrink wrap and packing foam from the system prior to moving it to a
cleanroom. Remove the protective plastic film from the front door, see 3.6 Unpacking the
Dispensing Chamber. If necessary, clean the system thoroughly.
8. Slowly lower the forklift until the dispensing system conveyor rail is at the approximate
height of the mating upstream and downstream equipment.
9. Raise or lower each leveler (foot) as follows until they all touch the floor:
a. Loosen the 1 1/2-inch lock nut on the leveler (Figure 3-2).
b. Adjust the 1 1/2-inch post nut to raise or lower each leveler as required.
Turning the post nut clockwise raises the leveler. Turning the post nut
counterclockwise lowers the leveler.
c. Tighten the lock nut finger tight.
Item Description Item Description
1 Lock Nut 4 Leveler (foot)
2 Post 5 1 1/2-inch Wrench
3 Post Nut
Figure 3-2 Adjusting the Levelers
1
5
4
3
2