N7201A652E.pdf - 第131页

NPM- TT2 EJM1EE-MB -02O-04 2-4-1 -6 Preparatio n

100%1 / 512
NPM-TT2 EJM1EE-MB-02O-04
Preparation of the
intelligent feeder 3
Attaching the separator to the feeder cart
(If the large reel is too heavy to operate smoothly)
1
Attach a spindle to the separator
Separator
Spindle
Screw
M4x8L
Attachment hole
For large reel
(2 locations)
Choose an attachment hole
according to the reel size.
Choose a spindle (accessory)
according to the mounting
pitch.
2
Attach the
separator to the
cart
Separator
Insert the top of the
upper side into the holder.
Separator
Fit the lower end through
the gap in the reel guide.
Attach it to sit on the
spacer.
3
Make sure that
the reel can
rotate
2-4-1-5
1
2
3
Separator
Operating procedure
2-4-1
Prepara-
tions
before
produc-
tion
Accessories
Part No.: N610119865AA
For 21 mm pitch (L: 19.2 mm)
Part no.: KXFB058WA00・・・2
pcs
For 42 mm pitch (L: 40.2 mm)
Part no.: KXFB058XA00・・・2 pcs
For 63 mm pitch (L: 61.2 mm)
Part no.: KXFB058YA00・・・2 pcs
For 84 mm pitch (L: 82.2 mm)
Part no.: KXFB058ZA00・・・2 pcs
Spacer
NPM-TT2 EJM1EE-MB-02O-04
2-4-1-6
Preparation
NPM-TT2 EJM1EE-MB-02O-04
Preparation of the tray
feeder 1
2
3
5
1
Adjusts the pallet in accordance with the tray dimensions and sets the tray to the pallet.
Loosen screws
of the pallet
Adjust and fix the movable guide
Release the clamp
Adjust and fix the
clamp position
Setting the tray to the pallet
4 screws
Movable guide
Place the tray on the pallet.
1 screw
Release position
Clamp release
lever
Clamp lever
Keep pushing the clamp
release lever until the
clamp lever is secured at
the release position.
Adjust and fix the rail
Slide the rail to leave a space
of about 1 mm between the
tray and the clamp.
Fix the rail
2 screws
4
Allow the clamp to press
down the center of the tray.
1 screw
Fix the pallet
with the clamp
6
Release the clamp lever
after pulling it until the clamp
release lever is disengaged.
2-4-2-1
Space: about 1
Rail
Clamp screw
Slide the movable guide
along the side of the tray.
Fix the movable guide.
1 2
1
2
3
Operating procedure
2-4-2
Prepara-
tions
before
produc-
tion