N7201A652E.pdf - 第208页

NPM- TT2 EJM1EE-MB -03O-02 3-2-2 -1 Operating time information is di splayed for each machine. ● For dual conveyor, you need to choos e a lane in advance. Produc- tion informa- tion Operating procedure 3-2-2 Oper a ting …

100%1 / 512
NPM-TT2 EJM1EE-MB-03O-02
3-2-1-14
Production
NPM-TT2 EJM1EE-MB-03O-02
3-2-2-1
Operating time information is displayed for each machine.
For dual conveyor, you need to choose a lane in advance.
Produc-
tion
informa-
tion
Operating procedure
3-2-2
Operating information
B A
C
B
A
Prod count
Prod count
The number of PCBs passed through
the specified stage.
PatternPiece
The number of PCBs produced
(components are mounted).
Total/Lot
Clear
Clears the count.
Rate
Rate
Rate of the actual operating time for
operating time.
MCOpRate
Rate of actual operating time and
process waiting time for operating time.
Choose the display type.
:The total number of
PCBs after switching
the production data
:The number of
PCBs per lot
Running time
NPM-TT2 EJM1EE-MB-03O-02
3-2-2-2
B A
C
Preparation time
Production
C
D
E
F
Operating time
RealOpTime
For single lane mode:
Time that previous and next processes
waiting time and stop time caused by error
are subtracted from time in production
mode.
(RealOpeTime
OpeTime - Total Stop time)
For dual lane mode:
me that previous and next processes
waiting time, stop time caused by error
and transfer time are subtracted from time
in production mode.
(RealOpeTime
OpeTime - Total Stop time-Transfer
time)
ProcWaitTime
Preparation time for previous and next
processes.
SupplyWaitTime
Waiting time for component supply.
StopTime
Downtime during production.
OpTime
Time that the machine is in production
mode.
Clears production information.
Total time
Shows the previous or next table.