N7201A652E.pdf - 第370页

NPM- TT2 EJM1EE-MB-04 O-03 4-2-12 -3 Produc- tion data teaching Placement point r ecognition teac h 2 Operating procedure 4-2-12 + 4 Set a PCB on the PCB entrance 5 (The PCB is loaded to the mount stage, and after PCB is…

100%1 / 512
NPM-TT2 EJM1EE-MB-04O-03
4-2-12-2
Setting
change
Measures mount position of a component on the PCB and teaches offset which is the difference of the
original position.
Turn On soft switch [Placement point recognition]of the created data with the NPM-DGS.
1
3
2
Choose the teaching
component
Perform on both and .
1
32
NPM-TT2 EJM1EE-MB-04O-03
4-2-12-3
Produc-
tion data
teaching
Placement point
recognition teach 2
Operating procedure
4-2-12
+
4
Set a PCB on the PCB
entrance
5
(The PCB is loaded to the mount stage,
and after PCB is recognized, the head
camera moves to the recognition mark
position)
6
7
+
(Recognition starts and the result is
displayed)
(The data is held)
5
6
7
NPM-TT2 EJM1EE-MB-04O-03
4-2-12-4
Setting
change
8
9
+
Multi-points recognition
(Moves to the next mount point
recognition mark position)
Repeat steps from to as
many times as there are
recognition points, and then
To
1 point recognition
10
10
Confirm the message
10
6
8
(The data is held)
8