Dek-265GSX-User-Manual.pdf.pdf - 第47页

5. The vacuum box can now be fitted into the appropriate location holes in the tooling plate. Ensure that the vacuum box is placed into the correct set of holes, taking regard of the type of screen being used and hence t…

100%1 / 388
STAGE 6B
Tooling Setup - Vacuum
CAUTION
BOARD CLAMPS. Care must be taken to ensure that the board clamps
are not damaged when removing or replacing tooling.
1.
Select Change Tooling (F6).
Change
Tooling
2.
Select Full Width (F5).
Full
Width
3.
Select Raise Head (F2).
Raise
Head
4. Raise the printhead using two button control. Fit the head prop.
1.30 User Manual Software Version 6
MACHINE PROGRAMMING
STAGE 6B
WARNING
BOARD CLAMPS. EXTREME CARE MUST BE EXERCISED WHEN
WORKING IN THE TOOLING AREA OF THE MACHINE TO AVOID
INJURY. THE FOILS ON THE FRONTAND REAR BOARD CLAMPS
AREVERYSHARP.
5. The vacuum box can now be fitted into the appropriate location holes in the
tooling plate. Ensure that the vacuum box is placed into the correct set of
holes, taking regard of the type of screen being used and hence the position
of the fixed rail.
6.
Select Head (F2).
Head
7. Remove the head prop. Lower the printhead using two button control.
8.
Press the System button.
Software Version 6 User Manual 1.31
MACHINE PROGRAMMING
STAGE 6B
9.
Select Board Width (F5).
Board
Width
10.
Select Board Stop (F4).
The camera moves to the board stop position. The board stop on the camera
extends.
11.
Select Raise Head (F2).
Raise
Head
12. Raise the printhead using two button control. Fit the head prop.
13.
Select Board Clamps (F3), to open the clamps.
Board
Clamps
14. Slide a board along the rails to abut the board stop.
15.
Select Board Clamps (F3), to close the clamps.
Board
Clamps
1.32 User Manual Software Version 6
MACHINE PROGRAMMING
STAGE 6B