00197471-03_Service Manual Internal WPC5_6, EN_01-2019.pdf - 第119页

Service Manual In ternal WPC5 / WPC6  Page 4-119 ➢ Place the „ Jig for W PC4-6 base p late “ [03073064- 01] (or a WPTC) i n the feed area (machine). ➢ Make sure that the driv er has engaged with t he gauge properly and …

100%1 / 172
Service Manual Internal WPC5 / WPC6
Page 4-118
4.1.2 Teaching the Zero Point Position
This calibration step determines the position of the lifting axis, for correct movement of the
waffle-pack tray carrier out of the tower (without obstacles).
Remove all waffle-pack tray carriers (WPTC) from the WPC.
Select the lifting axis (1).
Select the function
Teach zero position
(2).
Select
Next
(3).
Follow the instruction shown and continue with
Next
.
Follow the instruction shown (see following diagram) and continue with
Next.
Service Manual Internal WPC5 / WPC6
Page 4-119
Place the Jig for WPC4-6 base plate [03073064-01] (or a WPTC) in the feed area
(machine).
Make sure that the driver has engaged with the gauge properly and that the gauge is
correctly fitted onto the guide rail.
Service Manual Internal WPC5 / WPC6
Page 4-120
Use the arrow keys (2) to select the required pitch (1) (0.1 mm in this example).
Use the arrow keys to move the tower so that the tray can be correctly moved from the feed
axis into the tower.
Continue with
Next
(3).
Follow the instruction shown and confirm the changes made with
Finish
.