00197783-01_AI_Gantry-Retrofit_X-Series_S_INTERNAL_de_en.pdf - 第114页

Installation Fitting the Trailing Interface Boar ds 3.1.4 Removing the Top Cove r 114 Gantry Retrofit Portalna chrüstung ► First, establish all connections to the trailing interface, at the machine end. NOTICE! We recomm…

100%1 / 160
Installation
3.1.4 Removing the Top Cover Fitting the Trailing Interface Boards
Gantry Retrofit Portalnachrüstung 113
3.4
3.4 Fitting the Trailing Interface Boards
Fitting the Trailing Interface Boards
Fit the third spacer bolt (1).
Check whether the strain relief (1) for the hotlink ca-
ble (top right in the diagram) is present at all points.
If required, add more strain relief (1x spacer bolt, 2x
washer and 1x plastic strain relief each). Secure the
strain relief with Loctite 241.
Fit the two trailing interface boards (1) and the two Vi-
sion Hotlink Adapters (2), together with the assembly
plates (3).
Each assembly plate is fastened with an outer (4) and
a joint inner screw.
Make sure that the white hoses are run correctly (in
pairs on the left and right under the assembly plate).
Installation
Fitting the Trailing Interface Boards 3.1.4 Removing the Top Cover
114 Gantry Retrofit Portalnachrüstung
First, establish all connections to the trailing interface,
at the machine end.
NOTICE!
We recommend that you connect the orange hotlink
cable (1) later on.
Bind together all cables running through the middle
[03076516-xx (with X13ba and X14ba) and
[03076477-xx] (voltage for Vision Hotlink Adapter)
with a zipper hose (1) and stow these away between
the two vertical holders.
Connect the hotlink cables (1) and (2) and fasten this
with cable ties to the cable harness holder.
Installation
3.1.4 Removing the Top Cover Fitting the Trailing Interface Boards
Gantry Retrofit Portalnachrüstung 115
Fasten the shaft holder with a screw (1) to the middle
bolt.
Prepare the six Y pneumatic couplings in the order
10-10-8-10-10-8.
Fit the Y pneumatic couplings between the boards.
Perform the following steps on both sides of the
placement area.
Fasten all cables (but no hoses yet) to the holder,
with a cable tie (1).
Fasten all hoses with another cable tie (2) within the
area of the I beam (just under the upper edge). Do not
overtighten, to avoid pinching the hoses.
Fasten the hoses with another cable tie.